My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150230 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150230 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 9:28:19 AM
Creation date
9/30/2008 1:53:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150230
Contractor Name
Lincoln Park Crooked Ditch Company
Contract Type
Loan
Water District
12
County
Fremont
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />1 <br />I <br />1 <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />1 <br />I <br />II <br /> <br />Implementation Schedule <br /> <br />The LPCDC desires to begin construction as soon as possible, and anticipates funding to be approved by <br />late October, 2006. In order to accommodate construction starting later this year, all surveying and <br />engineering will need to be completed prior to CWCB funding. <br /> <br />As the loan requester (owner / applicant) is required to have 10% participation, and that engineering fees <br />are allowable in the loan package, LPCDC will defray the cost of the surveying and engineering fees in <br />advance of the CWCB funding, which will be approximately 5% of the project cost. <br /> <br />The construction schedule is anticipated to take 2 years to complete. There is an approximate 120 day <br />"window" of construction days per season, as the LPCDC desires to operate during the Spring and Summer <br />months. Construction will take place during the Fall and Winter months, when the structure is typically <br />shut down for the season. <br /> <br />The attached schedule in this section shows the anticipated construction activities. All construction should <br />be complete by February, 2008. <br /> <br />May 2006 <br /> <br />Implementation Schedule <br /> <br />14 <br /> <br />Lincoln Park Crooked Ditch Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.