My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150272 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150272 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 11:39:06 AM
Creation date
9/29/2008 12:54:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150272
Contractor Name
Farmers Pawnee Canal Company, The
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The shareholders of the FPCC have the ability to divert 140.4 cfs <br />from the South Platte River under their original irrigation <br />rights decreed November 15, 1894. These rights have two separate <br />appropriations; September 17, 1873 for 14.4 cfs and June 22, 1882 <br />for 126.0 cfs. The FPCC and its shareholders also have numerous <br />other decrees relating to recharge, augmentation and storage <br />water out of Prewitt Reservoir. <br /> <br />As mentioned before, the FPCC has had an average annual diversion <br />of 27,260 acre feet for all water diverted into the Pawnee ditch. <br />Yearly diversions for the FPCC would be considered fairly <br />inconsistent. variations in these numbers correspond to the <br />amount of rainfall during the irrigation season and overall <br />demand for recharge water. More rainfall in a certain year meant <br />that less water had to be diverted for irrigation that year and <br />vice versa. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $250,000. Project planning <br />and engineering design will be provided by Nation Engineering <br />Services, LLC. <br /> <br />Item <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />Total Cost <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />1. Earth Work (river) <br />2. Dewatering (river) <br />3. Sheet Piling (river) <br />4. Concrete Work (river) <br />5. 12' Radial Gate (river) <br />6. Earth Work (ditch structure) <br />7. Concrete Work <ditch structure) <br />8. 4 - 8' Radial Gates (ditch structure) <br />9. Contingency (20%) <br />10. Planning and Design Costs <br /> <br />Total Cost <br />~lementation Schedule <br /> <br />Feasibility Study <br />Farmers Pawnee Canal Company <br />Flow Control Structures <br />July 2008 <br /> <br />5 <br /> <br />Estimated Cost <br /> <br />$ 3,300 <br />$246,700 <br />$250,000 <br /> <br />Estimated Cost <br /> <br />$ 20,900 <br />$ 30,000 <br />$ 7,200 <br />$ 42,500 <br />$ 19,800 <br />$ 9,200 <br />$ 35,000 <br />$ 41,000 <br />$ 41, 100 <br />$ 3,300 <br /> <br />$250,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.