My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150236 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150236 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2013 10:25:07 AM
Creation date
9/29/2008 12:54:28 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150236
Contractor Name
Lazy O Ranch Homeowners' Association
Contract Type
Loan
Water District
38
County
Pitkin
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />approval and filing. <br /> <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff. <br /> <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br />are due. <br /> <br />SECTION 9 - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> <br />A. Preparing final designs and specifications for the PROJECT. <br /> <br />B. Preparing bid and construction contract documents. <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br />G. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br />Contract. <br />I. Legal services for reviewing engineering services contracts, reviewing this Contract, <br />reviewing construction contract documents, and for complying with all federal, state, <br />and local regulatory requirements. <br />M. PROJECT-related expenses incurred prior to the Effective Date of this contract in <br />accordance with the approval of this loan. <br /> <br />J. Payoff existing loans to Community Banks of Colorado. <br />10 - DISBURSEMENT SCHEDULE <br />For Project costs: The BORROWER shall prepare a periodic progress report which <br />contains a statement of the PROJECT costs expended for that period and shall <br />forward said statement to the CWCB. After receipt of the periodic progress report <br />from the BORROWER, and review and acceptance of the items therein as eligible <br />expenses as described below, the CWCB will pay to the BORROWER the amount set <br />forth in the report or such portion that has been approved by the CWCB. Such <br />payment shall be made within thirty (30) days from the CWCB's approval of each <br />progress report. <br />For loan payoffs: For loan disbursements to payoff existing debt described in <br />Section 9.J, the BORROWER shall provide the CWCB with a request that includes the <br />amount needed to pay in full each existing loan, the loan number and the name and <br />address, of the creditor, and the phone number and name of creditor contact. After <br />review and acceptance of the request, the CWCB will pay to the Borrower the <br /> <br />Appendix 1 to Loan Contract C150236 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.