My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150236 Approval letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150236 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 1:27:39 PM
Creation date
9/29/2008 12:54:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150236
Contractor Name
Lazy O Ranch Homeowners' Association
Contract Type
Loan
Water District
38
County
Pitkin
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br />, // >:.~.;~Y\ '.. <br /> <br />'/, "'_.,-, -- <br />~ ''''''1' <br /> <br />~~~.i~?' <br /> <br />November 17, 2006 <br /> <br />Bill Owens <br />Governor <br /> <br />Tony Clinco, Ranch Manager <br />Lazy-O-Ranch HOA <br />1907 Snowmass Creek Road <br />Snowmass, CO 81654 <br /> <br />Russell George <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />RE: Lazy 0 Ranch HOA Secondary Water System Loan <br /> <br />Dear Mr. Clinco: <br /> <br />I am pleased to inform you that on November 13,2006 the Colorado Water Conservation Board <br />(CWCB) approved your loan request. We understand that the loan will be used to pay for the <br />installation of pipe and pumps for the secondary water system on the Lazy 0 Ranch. <br /> <br />The Board approved an initial loan not to exceed $152,258 ($150,750 for project costs and $1,508 for <br />the 1 % Loan Service Fee) with loan terms of 4.25% per annum for 30 years. I have attached a copy of <br />the updated Board memo that includes the Board's approval of the Staff Recommendations. <br /> <br />When the Board approves a loan there remain several conditions: <br /> <br />a) Feasibility Study: Tim Feehan has reviewed the study titled "Lazy 0 Ranch HOA <br />Irrigation System, September 28, 2006". Modifications may be requested by Mr. <br />Feehan via phone/fax or email in the next couple days. The approved study, in <br />combination with the CWCB Board Memo revised November 14,2006, will meet the <br />requirements of the CWCB Construction Fund Guidelines for loan feasibility studies. <br /> <br />b) Contracting: An approved contract must be in place before funds can be advanced. <br />Vaughn McWilliams will initiate the loan contracting process for this project. Once the <br />contract is finalized the Company may request loan funds to cover eligible project <br />expenses. You can contact Vaughn at (303) 866.3462 regarding the requirements. <br /> <br />c) Design/Construction: You must adhere to the CWCB Design and Construction <br />Administration Procedures. Tim Feehan will contact you regarding the requirements <br />concerning construction. Tim will make construction site visits, which will be the basis <br />of pay estimates for disbursement of your loan funds. You can contact Tim at his office <br />at (303) 866.3480 or cell phone (303) 618.5010. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.