My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11506
CWCB
>
Floodplain Documents
>
DayForward
>
1100
>
FLOOD11506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:24:29 AM
Creation date
9/26/2008 11:17:07 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Jefferson County and Unincorporated Areas
Stream Name
Upper Bear Creek (Above Evergreen Lake)
Basin
South Platte
Title
LOMA - Affected Panel 0265E - Case No. 08-08-0513A
Date
5/22/2008
Prepared For
Jefferson County
Prepared By
FEMA
Floodplain - Doc Type
Current FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 2 of 2 I <br /> <br />I Date: May 22, 2008 <br /> <br />lease No.: OB-OB-0513A <br /> <br />. <br /> <br />I <br /> <br />LOMA <br /> <br />.~ <br />~'~E <br />~r~~~ <br />~ <br /><'-1"'D s~{; <br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />LETTER OF MAP AMENDMENT <br />DETERMINATION DOCUMENT (REMOVAL) <br />ATTACHMENT 1 (ADDITIONAL CONSIDERATIONS) <br /> <br />PORTIONS OF THE PROPERTY REMAIN IN THE FLOODWA Y (This Additional Consideration applies to <br />the preceding 1 Property.) <br />A portion of this property is located within the Special Flood Hazard Area and the National Flood Insurance <br />Program (NFIP) regulatory f100dway for the flooding source indicated on the Determination/Comment Document <br />while the subject of this determination is not. The NFIP regulatory floodway is the area that must remain <br />unobstructed in order to prevent unacceptable increases in base flood elevations. Therefore, no construction <br />may take place in an NFIP regulatory floodway that may cause an increase in the base flood elevation, and any <br />future construction or substantial improvement on the property remains subject to Federal, State/Commonwealth, <br />and local regulations for floodplain management. The NFJP regulatory floodway is provided to the community as <br />a tool to regulate floodplain development. Modifications to the NFIP regulatory f100dway must be accepted by <br />both the Federal Emergency Management Agency (FEMA) and the community involved. Appropriate community <br />actions are defined in Paragraph 60.3(d) of the NFIP regulations. Any proposed revision to the NFIP regulatory <br />f100dway must be submitted to FEMA by community officials. The community should contact either the Regional <br />Director (for those communities in Regions I-IV, and VI-X), or the Regional Engineer (for those communities in <br />Region V) for guidance on the data which must be submitted for a revision to the NFIP regulatory f1oodway. <br />Contact information for each regional office can be obtained by calling the FEMA Map Assistance Center toll free <br />at (877) 336-2627 (877-FEMA MAP) or from our web site at http://www.fema.gov/abouUregoff.htm. <br /> <br />PORTIONS OF THE PROPERTY REMAIN IN THE SFHA (This Additional Consideration applies to the <br />preceding 1 Property.) <br />Portions of this property, but not the subject of the Determination/Comment document, may remain in the Special <br />Flood Hazard Area. Therefore. any future construction or substantial improvement on the property remains <br />subject to Federal, State/Commonwealth, and local regulations for floodplain management. <br /> <br />This attachment provides additional information regarding this request. If you have any questions about this attachment, please contact the <br />FEMA Map Assistance Center toll free at (877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management <br />Agency, 3601 Eisenhower Avenue, Suite 130, Alexandria, VA 22304-6439. <br /> <br />U/JL.,..;. I( ~ I}-- <br /> <br />William R. Blanton Jr., CFM, Chief <br />Engineering Management Branch <br />Mitigation Directorate <br />
The URL can be used to link to this page
Your browser does not support the video tag.