My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150273 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150273 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2013 12:00:26 PM
Creation date
9/25/2008 11:01:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150273
Contractor Name
Ogilvy Augmentation Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />6. Will the acquisition of additional water rights be necessary? YES X NO <br />If YES, please explain. Water ri htg s acquisition is the primary purpose of the project. <br />Additional water ri htg s acquisition maybe required in the future to ensure un-curtailed <br />pumping of the wells. <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney(s). <br />NAME <br />Douglas C. Seely, PE <br />Dan Brown <br />ADDRESS and PHONE <br />300E 16~" Street #309 Greeley CO 80631 970-352-7766 <br />Fischer Brown Bartlett & Gunn PO Box Q Fort Collins, CO <br />80522 970-407-9000 <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Feasibility Study of the Ogi1vY Augmentation Com~any Well Augmentation <br />Pro,~ect March 2008 <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br />Estimated Engineering Costs: $ 40,000 <br />Estimated Construction Costs: $ 609 250 <br />Estimated Other Costs: $ 350.750 (land acquisition, water rights purchase,etc.) <br />Estimated Total Costs: $ 1.000 000 <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 900 000 (Usually 75-90 % of Est. Total Costs) <br />Term (length) of loan: 30 years (Usually lo, 20, or 30 years) <br />Interest Rate: 2.25 % (Please call for our current rates) <br />Part C. -Project Sponsor Financial Information <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit with this application, copies of the three most recent <br />annual reports, financial statements, corporate reports or other current documentation of financial <br />condition and operations. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.