Laserfiche WebLink
TABLE 8 <br />Storage Reservoir <br />ALTERNATIVE 4 - 100 Acre-Ft Reservoir with HDPE Liner <br /> <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNITS UNIT <br />PRICE <br />SUBTOTALS <br />AMOUNT <br />1. Insurance, Bonds 1 L.S. $ 4,100.00 $ 4,100 $ 4,100 <br />2. Mobilization, Demobilization 1 L.S. $ 8,300.00 $ 8,300 $ 8,300 <br />3. Dewatering/Erosion Control 1 Day $ 250.00 $ 250 $ 250 <br />4. Earthwork $ 271,500 <br /> a. Borrow 58000 C.Y. $ 2.50 $ 145,000 <br /> b. Fill 50600 C.Y. $ 2.50 $ 126,500 <br />5. Inlet Structure $ 2,500 <br /> a. Headgate 1 Ea $ 2,000.00 $ 2,000 <br /> b. Pipeline 1 Ea. $ 500.00 $ 500 <br />6. Outlet Headwall $ 8,000 <br /> a. Trash Rack 1 Ea $ 1,500.00 $ 1,500 <br /> b. Concrete 10 C.Y. $ 650.00 $ 6,500 <br /> c. Riprap 290 Tons $ 30.00 $ 8,700 <br /> d. Bedding 80 Tons $ 27.00 $ 2,160 <br />7. Outlet Structure $ 6,500 <br /> a. Sluice Gate, Operator, Thimble I Ea. $ 2,500.00 $ 2,500 <br /> b. Access Hatch 1 Ea. $ 1,000.00 $ 1,000 <br /> c. Concrete 10 C.Y. $ 650.00 $ 6,500 <br />8. Outlet Pipe $ 13,000 <br /> a. Pipe - 12" PVC 100 L.F. $ 50.00 $ 5,000 <br /> b. Concrete Encasement 20 C.Y. $ 400.00 $ 8,000 <br />9. HDPE Liner installation 620000 S.F. $ 0.48 $ 297,600 $ 297,600 <br />10. Seeding 2 Acres $ 2,500.00 $ 5,000 $ 5,000 <br />11. Roadbase 50 Tons $ 20.00 $ 1,000 $ 1,000 <br /> TOTAL CONSTRUCTION COST $ 618,000 <br /> CONTINGENCY(20%) $ 124,000 <br /> ENGINEERING/LEGAL/SURVEYING $ 95,000 <br /> TOTAL $ 837,000 <br />