Laserfiche WebLink
TABLE 6 <br />Storage Reservoir <br />ALTERNATIVE 2 - 50 Acre-Ft Reservoir with Clay Liner <br /> <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNITS UNIT <br />PRICE <br />SUBTOTALS <br />AMOUNT <br />1. Insurance, Bonds 1 L.S. $ 2,100.00 $ 2,100 $ 2,100 <br />2. Mobilization, Demobilization 1 L.S. $ 10,500.00 $ 10,500 $ 10,500 <br />3. Dewatering/Erosion Control 1 Day $ 250.00 $ 250 $ 250 <br />4. Earthwork $ 112,500 <br /> a. Borrow 24000 C.Y. $ 2.50 $ 60,000 <br /> b. Fill 21000 C.Y. $ 2.50 $ 52,500 <br />5. Inlet Structure $ 2,000 <br /> a. Headgate 1 Ea $ 2,000.00 $ 2,000 <br />6. Outlet Headwall $ 4,800 <br /> a. Trash Rack 1 Ea $ 1,500.00 $ 1,500 <br /> b. Concrete 5 C.Y. $ 650.00 $ 3,300 <br /> c. Riprap 290 Tons $ 30.00 $ 8,700 <br /> d. Bedding 80 Tons $ 27.00 $ 2,160 <br />7. Outlet Structure $ 6,500 <br /> a. Sluice Gate, Operator, Thimble 1 Ea. $ 2,500.00 $ 2,500 <br /> b. Access Hatch 1 Ea. $ 1,000.00 $ 1,000 <br /> c. Concrete 10 C.Y. $ 650.00 $ 6,500 <br />8. Outlet Pipe $ 13,000 <br /> a. Pipe - 12" PVC 100 L.F. $ 50.00 $ 5,000 <br /> b. Concrete Encasement 20 C.Y. $ 400.00 $ 8,000 <br />9. Riprap U.S. Face 7000 Tons $ 30.00 $ 210,000 $ 210,000 <br />10. Bedding U.S Face 3500 Tons $ 27.00 $ 94,500 $ 94,500 <br />11. Clay Liner 13000 C.Y. $ 15.00 $ 195,000 $ 195,000 <br />12. Seeding 2 Acres $ 2,500.00 $ 5,000 $ 5,000 <br />13. Roadbase 50 Tons $ 20.00 $ 1,000 $ 1,000 <br /> TOTAL CONSTRUCTION COST $ 658,000 <br /> CON TINGENCY(20%) $ 132,000 <br /> ENGINEERING/LEGAL/SURVEYING $ 95,000 <br /> TOTAL $ 885,000 <br />