My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150271 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150271 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 9:25:07 AM
Creation date
9/25/2008 11:00:51 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150271
Contractor Name
WRCC, Inc.
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />w <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CWCB Construction Fund Loan Application <br />4. Please provide a brief description of the owner's existing water supply facilities and describe any <br />existing operational or maintenance problems. Attach separate sheets if needed, and a map of the <br />service area. Big Windsor Reservoir, Douglas Reservoir #8 Reservoir Annex Reservoir <br />Elder Reservoir Cobb Lake Poudre Valley Ditch, Springer Ditch, Larimer & Weld Canal <br />For existing facilities indicate: <br />Number of shareholders 450 or Number of customers served <br />Current Assessment per share $ 275 <br />Numberofacresirrigated 55,000 <br />Number of shares 1000 <br />Water Right: _400 CFS. <br />Average water diverted per year: _35,000 acre-feet. <br />Part B. -Description of the Project <br />1. Name of the project or facility Big Windsor Reservoir <br />2. Purpose of this loan application. Check one. <br />New project <br />X Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a storage <br />restriction order from the State Engineer? YES NO X <br />4. General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal description, if known. Weld County WCR 19 & 74, <br />9 miles west of Eaton, 3 miles north of Windsor <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />Crest inauitenance' Southern abutment extension' Elunulation of abandoned spillway <br />Flood protection berm construction at north end• Spillway extension construction <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.