Laserfiche WebLink
<br />I <br /> <br />GREELEY & LOVELAND IRRIGATION CO. - EQUALIZER DAM REHABILITATION <br /> <br /> <br />Looking Down/Stream from the Dam at Emergency Spillway/5-Bay Outlet Gate Structure <br /> <br />Proiect Descriotion <br /> <br />This $385,000 project was the rehabilitation of the Greeley & Loveland Irrigation <br />Company's Equalizer Reservoir located east of Loveland. The project included replacement of the <br />dam outlet gate with a new structure, which incorporated both the outlet gate and a spillway. The <br />existing dam embankment was also raised almost four feet. ECl Consultants, Inc. of Englewood <br />prepared the construction plans and specifications with the construction contract awarded to <br />Schmuesor and Associates, Inc. of Wheatridge, CO. Construction commenced on November 16, <br />1998, was completed in early March 1999, with Substantial Completion on May 7, 1999. <br /> <br />Proiect Data <br /> <br />Sponsor: Greeley & Loveland Irrigation Co. County: Larimer <br /> <br />River: Big Thompson River <br /> <br />Terms of Loan: $308,000 @ 4.21 % for 30 yrs. <br /> <br />Substantial Completion Date: May 7, 1999 <br /> <br />Design Engineer: ECl Consultants, Inc. - Englewood, Colorado <br /> <br />Construction Contractor: Schmuesor and Associates, Inc. - Wheatridge, Colorado <br /> <br />I""'";',,'.,.,,, <br />'ill <br /> <br /> <br /> <br />., <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />I <br /> <br />,,"-' <br /> <br />Design Criteria: <br /> <br />Length of Dam Crest = 2,600 ft. <br />Volume of Reservoir = 1,700 ac.ft. <br />Outlet Gate = 5 -4 ft. x 4 ft. slide gates <br />100 - Year Emergency Spillway = 20 ft. long x 9 ft. high <br /> <br />Annual Volume of Water Delivered by the Project: 885 ac.ft. <br />