My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01871 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01871 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:14:42 AM
Creation date
9/22/2008 11:59:23 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153769
Contractor Name
Agricultural Ditch and Reservoir Company, The
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
SB 97-008
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />AGRICULTURAL DITCH & RES. CO. -AG DITCH/WELCH DITCHIMPROVElVIENTS <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />The Agricultural Ditch Pump Station at Colfax Avenue and Orchard Drive <br /> <br />Proiect DescriDtion <br />This $400,000+ project, located in Jefferson County east of Green MOlmtanin, abandoned <br />portions of the Welch Ditch by constntction of a dropout structure on the Welch Ditch to the Ag <br />Ditch, and a pump station/pipeline to lift water from the Agricultural Ditch back to the ,Welch <br />Ditch. Several landslide areas along the Welch Ditch that continued to create high maintenance and <br />water delivery problems for the company necessitated the project. Mountain States Engineering <br />Associates, Inc. of Lakewood prepared the project design. The pipeline, constructed by T. Lowell <br />Construction, Inc. of Castle Rock, and the pump station and dropout~structure, constructed by <br />Jennison Construction Co. of Littleton, commenced November 3, 1997 were completed in July <br />1998. Project documentation was received for substantial completion on October 31, 1998. <br />ProiectData <br /> <br />Sponsor: Agricultural Ditch & Res. Co. <br /> <br />County: Jefferson <br /> <br />River: Clear Creek <br /> <br />Terms of Loan: $300,000 @ 5.25% for 30 yrs <br /> <br />Substantial Completion Date: Oct. 31,1998 <br /> <br />Design Engineer: Mountain States Engineering Associates, Inc. - Lakewood, Colorado <br /> <br />Construction Contractors: T. Lowell Constmction, Inc. - Castle Rock, Colorado (pipeline) <br />Jennison Construction Company, Inc. - Littleton, Colorado <br /> <br />Design Criter'ia: <br /> <br />Pipeline Length = 5,000 ft. of various dia. PVC pipe <br />Pump Station = 3 -75 HP pump motors Dropout Pipe = 36 in. CMF <br /> <br />Annual Volume of Water Delivered by the Project: 1,000 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.