My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01870 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01870 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:18:08 AM
Creation date
9/22/2008 11:59:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153747
Contractor Name
Consolidated Extension Canal Company
Contract Type
Loan
Water District
67
County
Bent
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />f <br />t <br /> <br />, <br />~" <br />t <br />~ <br />~ <br />~ <br />", <br /> <br />~ _..~ <br /> <br />F~/\IJ/d <br />CONSOLIDATED l\fUTUAL CANAL COMPANY - SIPHON REHABILITATION <br /> <br /> <br />"" "!,;'~> ~ :H'~ ;~ <br />i.. -- j!: - ~_ i1~ ~ <br />~,; r\(~ {{: ;~ <br />" . I <br />'""';;"l(' <br /> <br />The Concrete Siphon Outlet Structure Looking West Across the Purgatoire River Valley <br /> <br />Proiect Descriotion <br /> <br />This project is the rehabilitation of a 1,000 foot long siphon of the Consolidated Mutual <br />Canallmder the Purgatoire River. The project included the replacement of 600 feet of wood stave <br />pipe with 48 inch diameter pre-cast concrete pipe and construction of a new concrete outlet <br />Structure. The concrete pipe was connected upstream to approximately 400 feet of existing 42 inch <br />diameter steel siphon pipe which was still in excellent condition after over 40 years of service. This <br />emergency project was completed on time and within budget. <br /> <br />Project Data <br /> <br />Sponsor: Consoliiiated Mutual Canal Co. <br />Yl.:i.;J. ~ L.j3~. C;o <br />Terms of Loan: $300,000 @ 3.75% for 30 years <br /> <br />County: Bent <br /> <br />River: Arkansas River' <br /> <br />Substantial Completion Date: Mar. 1 0, 1997 <br /> <br />Design Engineer: Public Service Company of Colorado - Denver, Colorado <br /> <br />Construction Contractor: Lillard and Clark Construction Co., Inc. - Denver, Colorado <br /> <br />Design Criteria: <br /> <br />Size and Type of Siphon Pipe = 48 inch concrete <br />Siphon Capacity = 70 cfs <br />Length of Siphon Rehab = 600 ft. <br /> <br />Annual Volume of Water Delivered by the Project: 9,300 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.