My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153742 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C153742 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2011 3:12:14 PM
Creation date
9/22/2008 11:59:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153742
Contractor Name
Beaver Park Water, Inc.
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 94-029
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />BEAVER PARK WATER COMPANY - BRUSH HOLLOW DAM REHABILITATION <br /> <br />I <br />I <br />. ! <br />i <br /> <br />I <br /> <br /> <br />/lLi~~ ;~ ':J. ~~ ~,~! iii <br />,;) <br /> <br />Stabilized Upstream Face of the Brush Hollow Reservoir Dam <br /> <br />Project Description <br /> <br />This project was the rehabilitation of the Brush Hollow Reservoir in Fremont County. The <br />Woodward-Clyde designed project commenced construction in November 1996 by Tezak Heavy <br />Equipment Company of Canon City. The project included the stabilization of the upstream dam <br />face and the replacement of the outlet structure. This work consisted of the construction of a new <br />concrete intake structure, a new gate control house and an extension of the 36 inch diameter steel <br />outlet pipe. Additionally, the outlet pipe required lining due to extensive corrosion which was <br />encountered during construction. The project was completed June 30, 1997. <br /> <br />Proiect Data <br /> <br />~ <br />~ <br /> <br />Sponsor: Beaver Park Water Company <br /> <br />County: Fremont <br /> <br />River: Brush Hollow Creek <br /> <br />Terms of Loan: $975,000 @ 3.5% for 30 yrs <br /> <br />Substantial Completion Date:June 30, 1997 <br /> <br />Design Engineer: Woodward-Clyde Consultants - Denver, Colorado <br /> <br />Construction Contractor: .Tezak Heavy Equipment Company, Inc. - Canon City, Colorado <br /> <br />Design Criteria: <br /> <br />Dam Height = 75 ft. <br />Crest Elevation = 5,504.5 <br />Reservoir Capacity = 4,125 ac.ft. <br /> <br />Annual Volume of Water Delivered by the Project: 4,125 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.