Laserfiche WebLink
<br />TOWN OF JOHNSTOWN - LONE TREE PIPELINE RECONSTRUCTION PROJECT <br /> <br /> <br />Placement ofthe 16 inch Diameter - Ductile Iron Pipeline <br /> <br />Proiect Description <br /> <br />This $2,700,000 project includes the replacement of 11 miles of open ditch with a 14-16 <br />inch pipeline from Lonetree Reservoir to the Town of Johnstown's water treatment plant including <br />a booster station at the reservoir and connection facilities at the treatment plant. PRC <br />Environmental Management, Inc. of Denver designed the project. The construction contract was <br />awarded to Hall-Irwin Construction Co. (pipeline) of Greeley and B.T. Construction, Inc. (pump <br />station/electrical) of Broomfield August 6, 1996. Construction commenced in early October 1996 <br />and was completed in May 1998. Project documentation and final accounting delayed substantial <br />completion until June 30, 1999. <br /> <br />Project Data <br /> <br />Sponsor: Town of Johnstown <br /> <br />County: Larimer/Weld <br /> <br />River: Big Thompson River <br /> <br />Terms of Loan: $1,948,932.60 @ 4% for 30 yrs. <br /> <br />Substantial Completion Date: June 30,1999 <br /> <br />Design Engineer: PRC Environmental Management, Inc. - Denver, Colorado <br /> <br />Construction Contractor: Hall-Irwin Construction, Inc. - Greeley, Colorado <br />B.T. Construction, Inc. - Broomfield, Colorado <br /> <br />Design Criteria: <br /> <br />Length of Pipeline = approx. 11 miles <br />Pipeline diameter = 14 - 16 inch <br />Pipeline Material = Ductile Iron Pipe <br /> <br />Annual Volume of Water Delivered by the Project: 2,200 ac.ft. <br />