Laserfiche WebLink
<br />1 " <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br /> <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board appr6val of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3, Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be a roved by State Engineer's <br /> <br />office) . <br /> <br /> <br />4, Boa rd s taff apPtfvr~,~ 0 ~;,i Jbl~r the pr~ j ect. Boa rd <br />staff present at~'ld open, g for constructIon. <br /> <br />5. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />construction schedule by Board staff. <br /> <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advan~e and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />8. The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />9. Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />10. SUbmittal of as-built drawings to Board staft for <br />approval and filing. <br /> <br />1588E <br /> <br />EXHIBIT F <br />