My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01858 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01858 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:14:41 AM
Creation date
9/22/2008 11:56:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153594
Contractor Name
Handy Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Bein <br />August 21, 1990 <br />Page 2 <br /> <br />5. Water requirements by the crops (consumptive use, effective <br />rainfall, farm efficiency) and estimated conveyance shrinkage based on the <br />history of deliveries (diversion records), water requirements for recreation <br />purposes, all water rights owned (including priorities and yields) and any <br />agreements regarding the water rights. <br /> <br />6. Description of the plan of development, including the physical plan <br />(existing and proposed) which will be based on review of information from the <br />State Engineer's Office, a topographic survey of a section of the dam, and an <br />analysis of outlet works needs. Geotechnical investigations will include <br />drilling two exploratory borings to bedrock. Based on this background <br />information, a conceptual plan for the rehabilitation will be prepared. <br /> <br />7. Estimated costs for construction of the improvements. <br /> <br />8. Evaluation of Handy Reservoir <br />borrowed for the project based on p <br />construction. <br /> <br /> <br />9. Financial program for~ <br />a payout schedule showing princi <br />repayment period. ; <br /> <br /> <br />10. Ten copies of the feasibility report will be prepared. <br /> <br />It is estimated that the cost for preparing the Phase I Feasibility <br />Report will be approximately $12,000. The costs are detailed on the attached <br />table. <br /> <br />PHASE II - DESIGN REPORT, PLANS AND SPECIFICATIONS. BID OPENING <br /> <br />Phase II of our services will include the following: <br /> <br />*Preparation of a Design Report, Plans and Specifications. <br /> <br />*S~b~ittal of Plans and Specifications tc the State ~nginesr's Office <br />and working with that office to obtain the required approval. <br /> <br />*Preparation and supervision of the bid offering for the required <br />construction. <br /> <br />PHASE III - CONSTRUCTION RELATED ENGINEERING SERVICES <br /> <br />The scope of Phase III services will include the following: <br /> <br />*Contract administration <br />*Construction observation <br />*Final inspection <br />*Preparation of As-Built drawings <br />
The URL can be used to link to this page
Your browser does not support the video tag.