Laserfiche WebLink
<br />,,-'0111, " <br /> <br />Handy (\^lclcl1) <br />Dam West (No.1) <br />~v/PB <br /> <br />IJll'd{ <br /> <br />. UK ,\l,l.....L \ .....L.\ltlf.K <br />]4-04-00 <br />RO 'TINt; NIIMBfR <br />( ..]"<. <br /> <br />$6,000 <br /> <br />CUNTR, <br /> <br />FEASIBILITY REPORT <br />CONTRACT <br /> <br />THIS CONTRACT. made Ihis ,;J f ".J~ay of (1'>/;/', (~.~/ 19 9 ~ . by and belween tbe <br />SCaCc of Colorado ror the use and henefil of lile Departmenl or'\ Natural Resources <br />(Colorado Water Conservation Board), <br />hereinarler rderred 10 as Ibe Slale. and '2 the Handy oi tch Company, <br />P. O. Box 1079, Berthoud, CO 80513, <br /> <br />hereinarrer rderred 10 as Ihe conlractor IContractor, <br /> <br />WHEREAS. authorily exisls in the Law and Funds have been budgeted. approprialed and otberwise made <br />available and a sufficient unencumbered balance 'hereof remains aYii!ab.lrJo.r, payment in Fund I'Iumber 400B . <br />G/L Accnunt Number 5252X, Cnlllra." Encllmbrance Numbel i"n'1\( ; and <br />ABL Account No. 12520, Org. Unit 77-77-777, <br />WHEREAS, required appn;v~( r1e;ranle and coordinalion bas been accomplished rrom and wilh appropriate <br />ogencies; and <br /> <br />WHEREAS. pursuant to the provisions of section 37-60-119. <br />Colorado Revised Statutes. as amended. the State is authorized <br />to construct certain water projects for the benefit of the <br />people of the State of Colorado; and <br /> <br />WHEREAS. the Handy Ditch Company has made application to <br />the State for the improvement of its existing facility. such <br />improvement of the facility is hereinafter sometimes referred <br />to as the project; and <br /> <br />WH~REAS. the Contractor is an incorporated ditch company <br />within the State of Colorado; <br /> <br />NOW THEREFORE. it is hereby agreed that: <br /> <br />1. The Contractor shall m ibility report prepared <br />and directed to the problem 0 the facilities of the <br />Handy (Welch) Dam West (No. 1 1n accordance with a propo~al <br />for a project feasibilitY'fi,re :m. 11M. y the consulting <br />engineering firm of Rocky. ta 0 I~ ts. Inc. (the <br />Consultant). and approved _ . w t' e. received September 27. <br />1990. which proposal is attached hereto as Appendix A and made <br />a part of this contract. <br /> <br />2. Five (5) copies of the final report called for in this <br />contract shall be furnished to the State not 'later than sixty <br />(60) days after the date of this contract. unless such time is <br />extended by mutual agreement of the parties hereto in writing. <br /> <br />3. As compensation for the services of the Contractor. the <br />State shall pay to the Contractor the sum of six Thousand <br />Dollars ($6.000) in the manner fOllowing: <br /> <br />a. Sixty percent (60%), to wit. Three Thousand Six Hundred <br />Dollars ($3.600) of the total amount due in two (2) monthly <br />installments of One Thousand Eight Hundred Dollars ($l.BOO) <br />each. commencing Thirty (30) days after the date of this <br />contract. <br /> <br />b. The remaining forty percent (40\). to wit. Two <br />Thousand Four Hundred Dollars ($2.400) within forty (40) <br />days following receipt and acceptance of the written report <br />specified in paragraph 2. of this contract. <br /> <br />4. The total cost of services to be rendered for the <br />Contractor by the Consultant is Twelve Thousand Dollars <br />($12.000) and the Contractor shall pay the sum of six Thousand <br />Dollars ($6.000) as agreed to by letter dated September 2B. <br />1990. which is hereby attached and made a part of this contract <br />as Appendix B; and in no event shall this payment be the <br />liability of the State of Colorado. <br /> <br />39S05}Q'}-1O'14 <br /> <br />Page , or -L- pages <br /> <br />EXHIBIT B <br /> <br />3330Elt <br />