Laserfiche WebLink
<br />Fonn 6-AC.o2A (R 5/85) <br />W/FRPB <br /> <br />Gurley Darn <br /> <br />APPENDIX A <br /> <br />Iu~.,,, <br /> <br />/IC .<;J9 ,$- 3.U <br />'C:NT OR AGENCY :-;U'>lBER <br />34-04-00 <br />CONTRACl ROUTING NUMBER <br />.>le}:: -/- ~ <br /> <br />ANENDMENT #1 <br />"FROJECT <br />CONTRACT <br /> <br />THIS CONTRACT. made this Y A day of 1;Jb~07~~ 198 Ji:: bv and between the <br />State of Colorado for the use and benefjl of tn; Department of" Natural Resources <br />(Colorado Water Conservation Board) , <br /> <br />hereinafter ...ferred to as the Slale. and '2 the Farmers .\later Development Companv, <br />Box 387, Norwood, CO 81423, <br />horeinafter referred 10 as the contractor.! Contractor. <br /> <br />$538,000 Additional <br /> <br />WHEREAS. authority exists in the Law and Funds have been budgeted. appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund Number 4008 . <br />G/L Account Number 537 OX . Contract Encumbrance NumberC 15 3 514 : and <br />ABL Account No. 13700, Org. Unit 77-77-777, <br /> <br />WHEREAS. required appmval. clearance and coordination has been accomplished from and with appropriale <br />agencies; and <br /> <br />WHEREAS. a contract was entered into on June 22, 1988. <br />Contract Encumbrance Number C-153514 (the Original Contract), <br />between the State and the Contractor; and <br /> <br />WHEREAS, foundation grouting was one of the construction <br />requirements for this project; and <br /> <br />WHEREAS, because of the un~y~ takes, the <br />Construction Firm has to work t .~ six days a week to <br />be able to handle the additiona. ; and <br /> <br />WHEREAS, because of the 1r~~i~1rl][~~ hours required <br />of t~e Construction Firm, ad.l!-l1ta>nr~Mering is also <br />requlred of the Consultant; and <br /> <br />WHEREAS. the loan amount of Seven Hundred Thousand Dollars <br />($700.000) has been authorized for this project; and <br /> <br />WHEREAS. the sa id loan may be increased' by "... such amounts. <br />if any. as may be justified by reason of.. .changes as required <br />by final engineering drawings and specifications...."; and <br /> <br />WHEREAS. onsite conditions have made changes in engineering <br />drawings and specifications necessary in order to respond to <br />the unusual grout takes at the Gurley Reservoir; and <br /> <br />WHEREAS. this additional work will cost the Contractor <br />additional money to repair the project; and <br /> <br />WHEREAS, the Consultant has estimated the total additional <br />cost for the project to be Five Hundred Thirty-Eight Thousand <br />Dollars ($538.000). making the total project cost One Million <br />Two Hundred Thirty-Eight Thousand Dollars ($1.238.000); and <br /> <br />WHEREAS, the Contractor. through a Resolution of its Board <br />of Directors, has agreed to this additional project cost; and <br /> <br />WHEREAS. repayments are in direct proportion to the amount <br />of money loaned; and <br /> <br />WHEREAS. the Contractor. through the above-mentioned <br />Resolution, has agreed that it can afford and will make the <br />additional payments required by this contract amendment. <br /> <br />NOW THEREFORE. it is hereby agreed that: <br /> <br />1. This contract amendment is a supplement to the Original <br />Contract (Attachment A), which is by this reference <br />incorporated and made a part hereof; and all the terms, <br />conditions. and provisions thereof. unless specifically <br />modified herein. are to apply to this contract <br /> <br />J95-5}{)1-1014 <br /> <br />Page I of --2.. pages <br />APPENDIX A <br /> <br />8531E <br />