My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01856 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01856 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:14:41 AM
Creation date
9/22/2008 11:46:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153406
Contractor Name
Handy Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />10. <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRk~ PROCEDURES <br /> <br />1. Board approval of eng ineering firm and eng ineering <br />agreement between engineering firm and project sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office). <br /> <br />4. Board staff approval of bidding for 'the project. Board <br />staff present at bid opening for construction. <br /> <br />s. <br /> <br />Project ,sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. <br /> <br />Conduct a pre-construction confer~ce. Approval of , <br />construction schedule by Board st~. <br />, gAt ~h <br />~onstru~tion c~mences. The)B:aa:-d ~~f;'f,,<Fj'keS ~riodic <br />lnspectlons durlng construc..lf.~r ],.,,;.1 change oroers must <br />be approv:o by the Boar~ staff in~d,;,,'nr'l; ..e and before any <br />constructlon on change ltems can com~~ ~j;Emergency <br />items cleared by telephone. ~ <br /> <br />The consulting engineer certifies that the project has . <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />7. <br /> <br />8. <br /> <br />9. <br /> <br />Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />Submittal of as-built drawings to Board staff for <br />approval and fil ing . <br /> <br />(Schedule A) <br /> <br />102 <br />schedja <br />
The URL can be used to link to this page
Your browser does not support the video tag.