My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01853 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01853 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 9:57:29 AM
Creation date
9/22/2008 11:44:19 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150210
Contractor Name
Little Thompson Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Project Summary
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LITTLE THOMPSON WATER DISTRICT <br />DRY CREEK RESERVOIR PROJECT <br /> <br />1- ~__ <br /> <br /> <br />Dry Creek Reservoir Dam Embankment and Spillway <br /> <br />Proiect Description <br /> <br />The Little Thompson Water District (L TWD) and the Central Weld County Water District (CWCWD) have <br />completed the construction of the 9,600 acre-foot Dry Creek Reservoir, at a 50/50 cost share. L TWD and <br />CWCWD jointly own the Carter Lake Filter Plant that treats Colorado Big Thompson (CBT) water at Carter <br />Lake, which prior to the construction of the new reservoir, had no storage capabilities. In wet years both <br />Districts were unable to treat and store all the water they were entitled to. Therefore in dry years with no <br />available storage, the Districts were forced to meet their demands for water from outside sources. In <br />addition, any maintenance to Carter Lake or the Saint Vrain Supply Canal would interrupt the operation of <br />the Filter Plant. To address the Districts storage concerns, this project involved the construction of 9,600 <br />acre-foot reservoir, with a pump station from the reservoir to the filter plant. <br /> <br />Proiect Data <br /> <br />Sponsor: Little Thompson Water District <br /> <br />County: Larimer <br /> <br />Water Source: CBT <br /> <br />Terms of Loan: $3,937,500@4.05%, 20-years Substantial Completion Date: October 1,2007 <br />$4,994,955@3.60%, 20-years <br /> <br />Engineer: Boyle Engineering Corporation - Lakewood, CO <br /> <br />Construction Contractor: R.E. Monk, Incorporated - Colorado Springs, Colorado <br /> <br />Project Elements: <br /> <br />Dam Height = 55-ft., Dam Length = 4,900-ft., Storage = 9,600 AF <br />7,000-ft -24-inch, Class 200-300 D.I.P 6,300 GPM Pump Capacity <br />1,000,000 C.Y. Embankment 31,000 c.Y. Rip Rap 24,000 Tons RCC <br /> <br />Average Annual Diversion: 8,850 acre-feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.