Laserfiche WebLink
<br />" " <br /> <br />-2- <br /> <br />c) You must adhere to the CWCB. Design and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCB requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will <br />be the basis of the monthly pay estimates for disbursement of your loan funds. Tim's <br />phone number is 303-894-2575. <br /> <br />On behalf of the Board, I would like to thank you for applying for a loan from the Colorado Water <br />Conservation Board. <br /> <br />Sincerely, <br /> <br />~~R <br /> <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachment: Updated Board Memo <br /> <br />cc (w/ Attachment): Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />