My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - Romero-Guadalupe Channel Rectification Project_Final Report
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - Romero-Guadalupe Channel Rectification Project_Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 9:46:39 AM
Creation date
9/19/2008 4:35:13 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Rio Grande
Applicant
Romero Irrigation Co.
Description
Romero-Guadalupe Channel Rectification Project
Account Source
Basin
Board Meeting Date
9/19/2007
Contract/PO #
08000000060
WSRA - Doc Type
Final Deliverable Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Max Nite of Romero Irrigation Company did work with Robins Construction in <br />supervising the project. <br /> <br />T?o <br /> <br />Max Nite <br />At the completion of the project, Rick Brown inspected the project and the NRCS <br />made certain it was completed according to their specifications. <br />A landowner's gate was replaced that had been damaged during the project. <br />Other cleanup occurred at the site. <br />The increased cost of fuel did add to the expense of the project, but it was felt it <br />was extremely necessary since previous attempts to correct the problem had not really <br />solved the problem. It was anticipated that the project would further reduce erosion and <br />prevent sediment deposition. It is now also believed that the channel will hold potential <br />floodwaters. <br />The project was completed in time for high river.
The URL can be used to link to this page
Your browser does not support the video tag.