Laserfiche WebLink
Max Nite of Romero Irrigation Company did work with Robins Construction in <br />supervising the project. <br /> <br />T?o <br /> <br />Max Nite <br />At the completion of the project, Rick Brown inspected the project and the NRCS <br />made certain it was completed according to their specifications. <br />A landowner's gate was replaced that had been damaged during the project. <br />Other cleanup occurred at the site. <br />The increased cost of fuel did add to the expense of the project, but it was felt it <br />was extremely necessary since previous attempts to correct the problem had not really <br />solved the problem. It was anticipated that the project would further reduce erosion and <br />prevent sediment deposition. It is now also believed that the channel will hold potential <br />floodwaters. <br />The project was completed in time for high river.