Laserfiche WebLink
Hauling and Placing Rock <br />In late March work began to reshape the river channel and stabilize the bank. <br />Gravel was hauled. This was followed by the construction of the J-hooks, cross vanes, <br />and rock weirs. Adam Robins of Robins Construction was meticulous in his placement <br />of rock. All work met NRCS specifications.