My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - Romero-Guadalupe Channel Rectification Project_Final Report
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - Romero-Guadalupe Channel Rectification Project_Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 9:46:39 AM
Creation date
9/19/2008 4:35:13 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Rio Grande
Applicant
Romero Irrigation Co.
Description
Romero-Guadalupe Channel Rectification Project
Account Source
Basin
Board Meeting Date
9/19/2007
Contract/PO #
08000000060
WSRA - Doc Type
Final Deliverable Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Late spring <br />The Romero Irrigation Company bank rectification project began in the spring of 2008. <br />It had been planned to repair channel changes that might allow flooding of the town of <br />Guadalupe and cause damage to the ditch company facilities. In preparation for the <br />project the ditch company had the NRCS design a riverbank and fish habitat plan. The <br />area had quite a severe winter that delayed the project somewhat. Robins Construction <br />began working with frost still in the ground which required extra work; however, high <br />water was expected on the river and it was necessary to try and complete the work as <br />soon as possible. Previous to the actual work on the river, headgates had been completed <br />and rock hauled.
The URL can be used to link to this page
Your browser does not support the video tag.