My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Yampa - Sand Wash Coalbed Methane Production Depletive Effects on Water Resources Study_Budget
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Yampa - Sand Wash Coalbed Methane Production Depletive Effects on Water Resources Study_Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2012 9:25:46 AM
Creation date
9/19/2008 12:58:26 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Yampa/White
Applicant
Moffat County
Description
Sand Wash Basin Coalbed Methane Production Depletive Effects on Water Resources Study
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
150435
WSRA - Doc Type
Supporting Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Example Project Personnel: Project Modeler Senior GIS Graphics/ Staff Total Costs <br /> Manager Geologist Specialist Designer Geologist <br />Hourly Rate: $131 $150 $99 $99 $64 $75 <br />Task 1-Research CBM Production 8 20 60 $7,537 <br />and Water Production <br />Task 2 -Characterize Basin 8 20 24 12 $6,158 <br />Stratigraphy and Structure <br />Task 3 -Characterize Regional 8 20 24 12 20 $7,664 <br />Ground Water Flow Systems <br />Task 4 -Relate Target CBM Intervals 4 20 24 $4,303 <br />to Local Aquifers <br />Task 5 -Relate Target CBM Intervals 2 16 $1,840 <br />to Surface Water Systems <br />Task 6 -Characterize Water Quality 2 16 24 $3,647 <br />of CBM Intervals, Local Aqufiers, and <br />Surface Water <br />Task 7 -Identify Areas Where Data 2 8 $1,051 <br />Are Insufficient <br />Task 8 -Devise Plan To Fill Data 2 8 $1,051 <br />Gaps <br />Task 9 -Collect Field Data (Water 8 240 $24,720 <br />Levels, Water Samples, Aquifer Tests) <br />Task 10 -Depletion Modeling 24 240 $26,813 <br />Task ll -Report Preparation 24 80 40 40 $17,548 <br />Task 12 -Public Meetings 16 40 $6,039 <br /> <br />Total Hours: <br />Cost: 108 0 728 88 64 128 $108,370
The URL can be used to link to this page
Your browser does not support the video tag.