Laserfiche WebLink
Other Direct Costs <br /> EST. UNIT <br />ITE <br />M <br />DESCRIPTION <br />QUANT. <br />UNIT <br />PRICE <br />TOTAL <br />1 Core Samples 1 L.S 6000 6000 <br />2 Travel 1 L.S. 3000 3000 <br />1 Mobilization 1 L.S. 3,500.00 3,500.00 <br />2 site prep 1000 C.Y. 3.50 3,500.00 <br />3 Embankment 3700 C.Y. 4.00 14,800.00 <br />4 water 200 Mgal 10.00 2,000.00 <br /> <br />5 Structure 12" <br />Agridrain <br />1 <br />EA. <br />1,500.00 <br />1,500.00 <br />6 12 CMP 25 L. F. 50.00 1,250.00 <br />7 Riprap 4 L. F. 75.00 300.00 <br />8 Pipeline- 6" SDR 51 8800 L. F. 10.00 88,000.00 <br />9 Well 1 L.S. 33,000.00 33,000.00 <br />10 Pump fixed 1 L.S. 50,000.00 50,000.00 <br />11 Pump floating 1 L.S. 15,000.00 15,000.00 <br />12 Power 1 Mi 10,000.00 10,000.00 <br /> <br />BID <br />PRICE $258,850.00 <br />INDIRECTS <br />10.89% <br />TOTAL <br />$287,038.77 <br />41