My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Ducks Unlimited Lower SP Water Protection and Wetland Restoration_C150432 Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
South Platte - Ducks Unlimited Lower SP Water Protection and Wetland Restoration_C150432 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2013 12:49:17 PM
Creation date
9/16/2008 4:46:36 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
South Platte
Applicant
Ducks Unlimited, Inc.
Description
South Platte Water Protection and Wetland Restoration Project
Account Source
Statewide
Board Meeting Date
9/17/2008
Contract/PO #
C150432
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account - Grant Application Form <br />Form Revised May 2007 <br />• Description of task: Complete water engineering and water court filings <br />Method or procedure that will be used or followed to accomplish the task and identifi- who will undertake the <br />task: Ducks Unlimited, SPWRAP, SPLRG, and LSPWCD will assist the landoi?iier in developing <br />engineering and legal documents required to complete water court filing to develop a new water right. <br />• Description of the major deliverables/products that will be produced upon successful completion of the task: <br />¦ Complete engineering details associated with the recharge plan. <br />¦ Copy- of water court filings and substitute supply- plan. <br />Task 4 <br />Description of task: Construct wetland impoundments via contour levees, and nistall water level control <br />structures. Contract construction components to eligible parties. Provide construction management <br />oversight through to project completion. <br />• Method or procedure that will be used or followed to accomplish the task and identifi who will undertake the <br />task: Levee construction: Ducks Unlimited will oversee project delivery through completion of the project. <br />Contractors will be selected through competitive bid processes as directed by federal guidelines. All permits <br />and clearances will be attained prior to constriction. <br />Description of the major deliverables/products that will be produced upon successful completion of the task: <br />Ducks Unlimited will deliver a completed project capable of delivering 2.500 acft of recharge credits <br />anrnuallv. <br />Task 5 <br />• Description of task: Secure a purchase and sale agreement and conduct due diligence for finalizing the <br />easement agreement <br />Method or procedure that will be used or followed to accomplish the task and identifi who will undertake the <br />task: <br />1) Execute a Purchase and Sale Agreement with landowner <br />2) Submit a PrelirninarN Propert< Inspection Report to DU for approval <br />3) Contract with professionals to complete the required due diligence including: <br />a. Baseline Documentation Report <br />b. Mineral Remoteness Report <br />c. NEPA Phase I Report <br />d. Easement Appraisal <br />e. Title Comrnitinent <br />4) Close and Record the Easement <br />• Description of the major deliverables/products that will be produced upon successful completion of the task: <br />a. Copy- of Purchase and Sale Agreement <br />24
The URL can be used to link to this page
Your browser does not support the video tag.