My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Halligan Seaman_Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
South Platte - Halligan Seaman_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2013 6:00:48 PM
Creation date
9/16/2008 4:36:00 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
South Platte
Applicant
City of Greeley
Description
Halligan Seaman Water Management Project: Shared Vision Planning Model
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
150436
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
water Supply Reserve Account - grant Application Firm <br />Form Revised 1V?ay ?Q47 <br />running series of operational and flow scenarios through the modes to analyze and document potential <br />project outcomes from both consumptive and non-consumptive needs Participants in this task include: <br />o William ?Bill? werick; <br />o pity of Greeley; <br />o pity of part allxns; <br />o Soldier banyan l?'iiter Plant ??'ri-Districts}; <br />o North Poudre trrigation company; and <br />o AMEG Earth Environmental hydrologist, Louis Lee} Rozaklis. <br />• Major deliverableslproducts: ?P model including water rights, water operational and hydrologic <br />components. <br />Ta <br />? ?escrlptlan of task: develop the ecological and blologlcal targets for ?ntegratlon into the SAP Model. <br />? Methodology and Project Participants: project participants listed above will a} carr?pile and collect data <br />associated with ecological and biological criteria and ecological flows, b? manipulate that da#a and then <br />translate it into the SAP model, c} share the SAP model with other project participants through a series <br />of two workshops to first collaboratively agree upon the model and d} assess alternatives by running <br />series oi' operational and flow scenarios through the rrrodel to analyze and docurent potential project <br />autcorr3es from both consurriptive and non-consumptive needs. Partlc?pants w111 include: <br />a The Nature ?anservancy: l?r. J'ahn Sanderson; <br />o Colorado State ?J?iversity; Dr. Leroy puff, Dr. Kurt Fausch; Dr. Boris I?ondratieff, and Dr. Brian <br />Bledsoe. <br />o OF Rocky Mtn Research Station and ?SU NREL NRR, Dr. David Merritt <br />a Miller Ecological Services, Dr? Bil1 Mi11er. <br />? Major deliverableslproducts; S?'l? rnodel including ecological and blologlcal criteria and ecological <br />flows. <br />Task ? <br />• Description of task: oversee and manage the development of the SAP model and facilitate the MVP <br />planning process. <br />• Mi ethadology and Project Participants: William Bill} Brick will work with project participants and <br />act to facilitate the SAP process, assist with development of the SAP modes and alternatives assessment <br />via scenario runs of the model, organize and administer two model development workshops, and will <br />provide oversight to ensure completion of the process and development of a functional and <br />collaborative model that is accepted by all project pat?icipants. The Participant will be William <br />werick, werick creative Solutions, LLB. <br />• Major deliverableslproducts; S?'P model including water rights, water operational and hydrologic <br />components, ecological and biological criteria and ecological flaws. <br />
The URL can be used to link to this page
Your browser does not support the video tag.