My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - Off-Channel Reservoir Sites in Crystal River Watershed_Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - Off-Channel Reservoir Sites in Crystal River Watershed_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2012 1:17:42 PM
Creation date
9/16/2008 2:38:40 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Colorado
Applicant
West Divide Water Conservancy District
Description
Feasibility and Design Assessment of Off-Channel Reservoir Sites in the Crystal River Watershed
Account Source
Basin
Board Meeting Date
9/17/2008
Contract/PO #
09000000052
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account -Grant Application Form <br />Form Revised October 2006 <br />4. Please provide a brief narrative of any related or relevant previous studies. Attach additional <br />sheets as needed. <br />The proposed storage sites have been reviewed in the field to identify site conditions that may impact <br />construction. No fatal flaws were identified during these site reviews. <br />Crystal River water rights that are adjudicated to the West Divide Water Conservancy and to the Colorado <br />River Water Conservancy District have been reviewed. It has been determined that these conditional water <br />rights will likely provide a viable and reliable source of supply to the proposed storage facilities. <br />Water right administration of the Crystal River has been reviewed with the Division of Water Resources. <br />From this review it has been determined that the reservoir sites are in a location that can satisfy the water <br />supply objectives outlined in item 3 above. <br />A preliminary discussion of permit requirements has been held with Pitkin County representatives. No fatal <br />flaws from a permitting standpoint have been identified at this time. <br />Crystal River water demands have been quantified in several recent studies. In 2003 and in 2005, Grand <br />River Consulting evaluated potential water demands in the Crystal River watershed, under a contract with <br />the Colorado River District. These studies concluded that as much as 12,000 acre feet of additional water <br />could be required to meet existing irrigation demands in drought years, and that instream flow demands are <br />even greater. Based on these assessments it is clear that the demand for water in the Crystal River <br />watershed will exceed any supply that can provided by the off channel reservoirs that will be evaluated in <br />this project. <br />5
The URL can be used to link to this page
Your browser does not support the video tag.