Laserfiche WebLink
Sopris Engineering, LLC <br />Schedule of Hourly Rates <br />Effective January, 2008 <br />Total project charges are based on hourly rates, plus direct job expenses as follows: <br />Personnel Charges <br />Principal Engineer, Principal Surveyor <br />Project Manager <br />Project Engineer (P.E.), Survey Manager (L.S.) <br />Design and/or Field Engineer, Survey Supervisor <br />Technician, Field Observer, Party Chief <br />Technical Typist, Clerical <br />Three-man Survey Crew <br />Two-man Survey Crew <br />Robotic Survey Crew <br />GPS Survey Crew <br />Courtroom Expert Testimony <br />Court and Deposition Preparation <br />Deposition <br />Computer Charges <br />Computer Plots <br />Online Research <br />Miscellaneous Charges <br />Photocopies <br />Blackline/Blueline prints <br />Mylar Sepias <br />Vehicle Mileage <br />Overnight Delivery (in state) <br />Overnight Delivery (out of state) <br />Custom Billing Forms <br />Outside Consultants orsub•Contractors <br />Other Direct Project Expenses <br />Travel Expenses: <br />Airfare, lodging, meals, car rental, telephone, parking fees, etc. <br />$170.00/hr. <br />$120.00/hr. <br />$ l 05.00/hr. <br />$90.00/hr. <br />$80.00/hr. <br />$50.00/hr. <br />$160.00/hr. <br />$140.00/hr. <br />$140.OOlhr. <br />$180.OOlhr. <br />$250.OOlhr. <br />$170.OOlhr <br />$200.OOlhr <br />$20.OOlea. <br />Additional $20.001 hr <br />$0.15/ea. <br />$1.50/ea. <br />$20.00/ea. <br />$0.50/mi. <br />as charged <br />as charged <br />$20.00/hr <br />Billed at Our Cost plus 10% <br />Billed at Our Cost <br />502 Main Street Suite A3 Carbondale, CO 81623 (970) 704-0311 Fax (970) 704-0313 <br />SOPRIS ENGINEERING • L LC ?????consultants