Laserfiche WebLink
Water Supply Reserve Account - Grant Application Form <br />Form Revised May 2007 <br />Gallons per Minute, and a conditional award of 78 Gallons per Minute. An application for Finding of Diligence <br />was filed on March 6, 2002, and continued until December, 2008 under Case No. 02CW 24(W-2923). <br />Please provide a brief narrative of any related or relevant previous studies. <br />"Water Collection, Treatment and Transmission Study", Prepared for: Barry Cress, Town Administrator, Town <br />of Fowler, Colorado Prepared by: Department of Civil Engineering, Fowler Design Group Colorado State <br />Universitv, Fort Collins, Colorado <br />This Study researches several different options and concludes that Fowler should develop the "North" Springs, <br />and also construct a Reverse Osmosis system for water softening. <br />Additional Information - If you feel you would like to add any additional pertinent information please feel <br />free to do so here. <br />The above statements are true to the best of my knowledge: <br />Signature of Applicant: <br />Print Applicant's Name: <br />Project Title: Installation of a potable water delivery Main for the <br />Town of Fowler, Colorado <br />Return this application to: <br />Mr. Rick Brov n <br />Intrastate Water Management and Development Section <br />COLORADO WATER CONSERVATION BOARD <br />1580 Logan Street, Suite 600 <br />Denver, CO 80203 <br />To submit applications by Email, send to: rick.brow iyd state.co.us <br />To submit applications by Fax, send to: (303) 894-2578 <br />For questions, call Telephone No.: (303) 866-3426 <br />Reference Information <br />The following information is available via the internet. The reference information provides additional detail <br />and background information regarding these criteria and guidelines and water policy issues affecting our state. <br />13