My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Fowler Water Resource Development_Application 1
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Fowler Water Resource Development_Application 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2009 2:23:24 PM
Creation date
9/16/2008 2:02:23 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Arkansas
Applicant
Town of Fowler
Description
Water Resource Development for the Town of Fowler, CO
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account - Grant Application Form <br />Fonn Revised May 2007 <br />Task 2 (Repeat the above format for each task) <br />IL Personnel <br />Provide a list of key water activity/project participants and their qualifications to accomplish the water <br />activity-/project If specific individuals or funds have not yet been identified indicate the types of expertise that <br />will be sought (i.e. professional engineering firm, registered land surveyor, aquatic biologist etc.). <br />III. Bud6et <br />A detailed budget by task, which includes the level of effort (hours) and rates. Anv unit costs or other direct <br />costs must be specified (i.e. mileage, number of miles, dollars per mile). For an example budget format - See <br />Attachment l at the end of this application. <br />If applicable, the budget should also detail the source and amount of matching funds and/or in-kiiid contributions, <br />if any. If applicable, the budget should also include any other outstanding or previously applied for funding that <br />also supports the water activity: <br />IV. Schedule <br />A detailed project schedule including key- milestones and the dates these are expected to be completed. <br />NOTE. Costs incurred prior to execution of a contract or purchase order are not subject <br />to reimbursement. <br />Water Availabilitv and Sustamability - this information is needed to assess the viability and effectiveness of the <br />water project or activity. Please provide a description of each water supply source to be utilized for, or the water <br />body to be affected by, the water activity. For water supply sources being utilized, describe its location, yield, <br />extent of development, and water right status. For water bodies being affected, describe its location, extent of <br />development, and the expected effect of the water activity on the water body, in either case, the analysis should <br />take into consideration a reasonable range of hydrologic variation. <br />Potable Water Supply Summary: <br />Existing Sources: <br />Spring Name Water Production Rate Selenium Level (Micrograms/Liter) <br />A 10.0 Gallons/Minute 96.0 <br />B 10.0 Gallons/Minute 140.0 <br />C 5.0 Gallons/Minute 130.0 <br />D 15.0 Gallons/Minute 65.0 <br />E 20.0 Gallons/Minute 38.0 <br />11
The URL can be used to link to this page
Your browser does not support the video tag.