My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Platte - Pine Beetle USFS - Water Activity Summary Shee
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
North Platte - Pine Beetle USFS - Water Activity Summary Shee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2013 4:13:32 PM
Creation date
9/15/2008 3:59:59 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
North Platte
Additional Roundtables
Colorado
Applicant
US Department of Agricultural, US Forest Service, Rocky Mountain Research Station
Description
Effects of Mountain Pine Beetle
Account Source
Basin & Statewide
Board Meeting Date
11/18/2008
Contract/PO #
C150440
WSRA - Doc Type
Water Activity Summary Sheet - CWCB Evaluation/Approval Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
effectively manage affected forests. Matching support in the form of in-kind contributions is <br />substantial in salaries, instruments, equipment and vehicles needed to complete the proposed <br />research. <br />Discussion: <br />This project is consistent with research needs identified in last year's Board commissioned study <br />by S.S. Papadopulous, "Action plan: Guidelines Prioritizing HB 1130 Spending for the <br />Protection of Water Supplies." It also involves personnel and in-kind services from the Colorado <br />State Forest Service, and is endorsed by that entity. Some more specificity is needed as to the <br />hydrologic parameters and relationships which will be determined through the research and how <br />that information will be presented and supported in published reports. The applicant needs to do <br />more than collect and archive data for this research to have a benefit to water managers. <br />Issues/Additional Needs: <br />1. Prior to contract award specify and agree on the number and location of test plots. <br />2. Prior to contract award specify and agree on precise deliverables to be provided and a peer <br />review process. Make sure deliverables completely document runoff and other hydrologic <br />relationships developed in study. <br />3. Simplify apportionment of budget between basin and statewide funds to facilitate invoicing <br />and accounting. <br />Staff Recommendation: <br />The application is well prepared and the proposed project furthers the North Platte Basin <br />Roundtable's needs assessment. It also helps addresses a critical water supply need in the basin. <br />Staff recommends approval of up to $212,000 from the North Platte Basin Account and <br />$165,000 from the Statewide Account to help complete the "Effects of Mountain Pine Beetle and <br />Forest Management on Water Quantity, Quality and Forest Recovery - North Platte and Upper <br />Colorado River Basins" project contingent on resolution of the item in the issues/additional <br />needs section. <br />All products, data and information developed as a result of this grant must be provided to CWCB <br />in hard copy and electronic format as part of the project documentation. This information will in <br />turn be made widely available to Basin Roundtables and the general public and will help <br />promote the development of a common technical platform. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.