My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24 (3)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
24 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:34 PM
Creation date
8/21/2008 3:32:52 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/21/2008
Description
ISF Section - Injury with Mitigation - Case No. 5-07CW210; Application of Vail Associates, Inc. and the U.S. Forest Service
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Linda J. Bassi April 29, 2008 <br />Page 2 <br />Location of injury <br />The proposed structure that is the subject of this Mitigation Proposal is the Tea Cup <br />Bowl Well No. 1, claimed for 15 gallons per minute (gpm) conditional, with an <br />appropriation date of June 12, 2007. The source is groundwatertributary to Two Elk <br />Creek, which is tributary to the Eagle River. The well is to be located within the NW ~/4 of <br />the SW ~/4 of Section 27, Township 5 S, Range 80 W, 6th Principal Meridian, 1,383 feet <br />from the South line and 404 feet from the West line of the NW ~/4 of SW ~/4 of said <br />Section 27. This location is northeast of the base of Chair 36 (Tea Cup Express Lift), as <br />shown in Figure 1. The Tea Cup Bowl Well is adjacent to an unnamed drainage near <br />the upper terminus of the 4-mile reach of the CWCB's 4.0 cfs ISF water right. <br />De Minimus Rule considerations (ISF Rule 8c.) <br />Under the CWCB's Rules Concerning the Colorado Instream Flow and Natural Lake <br />Level Program, if "[S]taff determines a water court application would result in a 1 percent <br />depletive effect or less on the stream reach or lake subject of the ISF" the staff may find <br />that the depletion would be "De Minimus." If the depletive effect of the proposed well is <br />found to be "De Minimus" by the staff, then the CWCB would not file a Statement of <br />Opposition to the application for the water right for the well. In applying the De Minimus <br />Rule, the CWCB staff uses the amount of the ISF appropriation as the basis for <br />calculating the maximum allowable depletion (telephone discussion with Bahman Hatami <br />05/03/2007). Based on this calculation, the maximum (1 %) depletion that would be <br />considered De Minimus is 0.04 cfs. The impact of pumping from the proposed well at <br />the rate of 15 gpm (0.033 cfs) is less than the 0.04 cfs flow reduction that would typically <br />be considered de minimus. However, since there is rarely, if ever, 4.0 cfs at the <br />headwaters of Two Elk Creek, particularly in the winter, a De Minimus calculation based <br />on actual flows might be greaterthan the 1% standard. <br />To avoid a dispute over the proper interpretation of the De Minimus standard, this <br />Mitigation Proposal serves to define a De Minimus operational scenario that limits <br />pumping during certain months, and alternates pumping with recovery periods so that <br />instream flows and aquatic habitat are protected in Two Elk Creek. This proposal <br />includes additional mitigation that would enable the Board's water right to continue to <br />preserve or improve the natural environment to a reasonable degree. <br />Quantification of injury (amount, timing and frequency) <br />When water is pumped from the Tea Cup Bowl snowmaking well, there would be no <br />change in streamflows in the Eagle River below Two Elk Creek. As part of the <br />augmentation plan by exchange, VA seeks approval to release up to one acre-foot of <br />water from Eagle Park Reservoir, plus the amount required for transit loss, to the Eagle <br />River to replace all of the depletions from the well, thus preventing injury to any <br />downstream water rights on the Eagle River and Colorado River below Two Elk Creek. <br />The extent of depletions to Two Elk Creek would not exceed one acre-foot of water per <br />year. Under the proposed operating plan for the Tea Cup Bowl Well, pumping would be <br />limited to 10 hours per day beginning on November 1 St and ending on December 31St <br />AMEC Earth and Environmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.