My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24 (3)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
24 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:34 PM
Creation date
8/21/2008 3:32:52 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/21/2008
Description
ISF Section - Injury with Mitigation - Case No. 5-07CW210; Application of Vail Associates, Inc. and the U.S. Forest Service
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Background <br />Applicant Vail Associates has requested water rights for a low capacity snowmaking well <br />tributary to Two Elk Creek which is tributary to the Eagle River. Vail Associates seeks approval <br />of a conditional water right, including approval of a plan for augmentation and appropriative <br />rights of exchange, to replace out-of priority depletions associated with diversions from Tea Cup <br />Bowl Well No. 1, up to a maximum of 1 acre-foot per year. The exchange reach is from the <br />confluence of Two Elk Creek and the Eagle River up to points of impact from the well on Two <br />Elk Creek. <br />The Board filed a statement of opposition to this application because, although the injury <br />qualifies as "de minimis," pursuant to ISF Rule 8(e), the Applicant requested assurance that <br />CWCB would not place a call for its ISF water right against the Applicant's water right, which <br />the CWCB cannot provide under ISF Rule 8(e). Based upon discussions and a site visit with the <br />Applicant prior to the filing of this application, the CWCB filed a statement of opposition and <br />became a party in this case with the intent of negotiating terms and conditions related to an <br />injury with mitigation proposal to include in a stipulation and final decree. The exercise of the <br />proposed rights could adversely impact the Board's instream flow ("ISF") water rights listed <br />below. <br />CWCB <br />Case No. Stream/Lake Amount <br />cfs Approp. <br />Date Watershed County <br />5-78W3797 Two Elk Creek 4 5/12/78 Eagle River Eagle <br />5-78W3788 Eagle River 25/11 5/12/78 Eagle River Eagle <br />5-78W3796 Eagle River 50/20 5/12/78 Eagle River Eagle <br />5-80CW134 Eagle River 85/35 3/17/80 Eagle River Eagle <br />5-80CW126 Eagle River 110/45 3/17/80 Eagle River Eagle <br />5-80CW124 Eagle River 130/50 3/17/80 Eagle River Eagle <br />(See map attached to this memo). This injury with mitigation proposal only addresses impacts to <br />the Two Elk Creek ISF water right. Depletions affecting the Eagle River will be augmented <br />under the Applicant's plan for augmentation with releases from Eagle Park Reservoir. CWCB <br />staff will negotiate separate terms and conditions to assure 100% protection of the CWCB's <br />Eagle River ISF water rights. <br />The Two Elk Creek ISF water right extends through the Vail Mountain Ski Resort in the White <br />River National Forrest, and diversions associated with the well claimed in Vail Associates' <br />application will occur within the ISF reach. Vail Associates has agreed to protect Two Elk <br />Creek by: (1) adjusting its pumping schedule so that impacts on streamflows in Two Elk Creek <br />will be minimized; and (2) installing three stream habitat improvement structures in Two Elk <br />Creek to create new pools, enhance existing pools, or deepen the channel so as to improve the <br />hydraulic conditions for fish habitat during periods of low flow. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.