My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18 (3)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
18 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:36:22 PM
Creation date
8/21/2008 10:39:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/21/2008
Description
CF Section - New Project Loans - Granby Ditch and Reservoir Company - Granby #12 Dam Rehabilitation Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Granby Ditch & Reservoir Company Agenda Item 18 <br />May 13, 2008 <br />Page 2 of 5 <br />Background <br />The Company owns and operates the Granby Ditch and six reservoirs in Delta County located <br />within the Grand Mesa National Forest. It prov ides storage and delivery of irrigation water to <br />approximately 2,400 acres through the Granby Ditch. The distribution system on the Grand Mesa <br />involves a unique system of exchange decrees, so the area serviced by the Company ranges across <br />the Surface Creek and Tongue Creek drainage areas. <br />One of the six reservoirs owned by the Compa ny is Granby Reservoir #12 (Reservoir). This <br />Reservoir is a headwater reservoir and is filled by snow melt and seasonal springs . It was originally <br />constructed in 1910 with a storage capacity of 814 AF. It was en larged in 1949 to a capacity of 838 <br />AF. <br />This Reservoir has been restricted by five feet due to a slump on the downstream face of the dam. <br />The restriction has been in place since 1976 and reduces the storage capaci ty of the Reservoir by <br />250 AF. The Company intends to repair the dam and bring the Re servoir back to full capacity; <br />thereby enabling the Company to maintain thei r storage rights and meet the needs of its <br />shareholders, especially during dry years. <br />Loan Feasibility Study <br />The Loan Feasibility Study titled “ Feasibility of Repair and Rehabilitation of Granby #12 Dam, <br />April 2008 ” was prepared by the Company with suppor t from Norm Aufderheide at Buckhorn <br />Geotech, Montrose. The study was prepared in acco rdance with the CWCB guidelines and includes <br />preliminary engineering desi gn and cost estimates. <br />The Company, through its engineer, has been in contact with the State Engineer’s Office (SEO). <br />Final plans have not yet been submitted; however a drilling program was approved by the SEO. <br />Information from this drilling will be used by Buc khorn Geotech for the final design of the project. <br />Granby Ditch & Reservoir Company <br />The Company is located in Cedaredge and is a regi stered Ditch Company in the State of Colorado. <br />The Company was incorporated in April 1894, for the purpose of providing irri gation water storage. <br />There are currently 81 sharehol ders and 700 shares of stock. The Company is governed by a 5- <br />member Board of Directors. The Company has the authorization to set a nnual assessments and the <br />authority to shut off water delivery to shareholders that fail to pay assessments, and the authority to <br />rescind and resell shareholder st ock to pay back assessments. <br />Water Rights <br />The source of water for the Company’s storage right s is Dirty George Creek. There are two storage <br />decrees for the Reservoir totaling 838 AF. <br />
The URL can be used to link to this page
Your browser does not support the video tag.