Laserfiche WebLink
North Platte Basin Roundtable 06.17.2008 6 <br />August meeting date: August 26, 7-9 pm <br />Kent C: Since Bob Timberman is here, I want to address the Ducks Unlimited (DU) <br />application. DU did submit an application, they submitted it directly to Rick Brown <br />instead of to the roundtable first, I asked the roundtable members if they wanted to waive <br />the requirement of initial submittal to the roundtable, the roundtable feedback was "nq <br />we should not change the n~les." A large portion of what DU wants to do with the <br />project is already underway and being done; Greg Kernohan should come up so I can <br />show him what is being done and the possible duplication with this proposed project. <br />Change to WSRA Process Fact Sheet: <br />Debbie Alpe found the following mistake in the Fact Sheet: In the North Platte section <br />where the criteria "box" is shown on Page 6, at the bottom it should read "Other North <br />Platte Basin-Specific Criteria," but it reads "Other Colorado Basin-Specific Criteria." <br />Curran will email Viola to get this changed. <br />No other business. <br />Meeting adjourned. <br />