Laserfiche WebLink
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />Fax: (303) 866-4474 <br />www.cwcb.state.co.us <br />Bill Ritter, Jr. <br />TO: Colorado Water Conservation Board Members <br />Governor <br />Harris D. Sherman <br />FROM: Tim Feehan, P.E., Project Manager <br />DNR Executive Director <br />Mike Serlet, P.E., Chief <br />Jennifer L. Gimbel <br />Water Supply Planning and Finance Section <br />CWCB Director <br />Dan McAuliffe <br />DATE: May 13, 2008 <br />CWCB Deputy Director <br />Consent Agenda Item 2a, May 20-21, 2008 Board Meeting <br />SUBJECT: <br />Water Supply Planning and Finance – Changes to Existing Loans <br /> Orchard Mesa Irrig. District – Stokes Gulch Si phon Replacement <br />Introduction <br />At the May 2005 Board Meeting, the Board authorized staff to present revisions to existing loans, totaling <br />less then 20% of the original loan , as Consent Agenda Items. The Orchard Mesa Irrigation District <br />(District) loan increase presented below represents an approximate 11% increase to their original loan <br />authorization <br />At the March 2006 board meeting, the Colorado Water Conservation Board (CWCB) approved a loan to the <br />District in the amount of $540,000 from the Severa nce Tax Trust Fund Perpetual Base Account. The <br />$540,000 loan was for the construction of 300 foot long, cast-in-place, 12 foot by 12 foot concrete box <br />culvert, at a total estimated cost of $600,000. <br />The Company is requesting an increase of $60,000 to the District’s 2006 authorization of $540,000, to <br />complete the replacement of the siphon. The requested loan increase is due to higher then anticipated bid <br />results, canal rehabilitation, and additi onal concrete and embankment material. The final cost to complete <br />the project will be approximately $745,000, The Distri ct has elected to only pursue an additional $60,000 <br />from CWCB with the remaining construction costs being covered directly by the District. <br />Staff Recommendation <br />Staff recommends a loan increase not to exceed $60,000( $59,400 for project costs and $600 for the 1% Loan <br />Service Fee) to the District for engineering and co nstruction costs associated with the Stokes Gulch Siphon <br />Replacement Project, from the Severance Tax Trust Fu nd Perpetual Base Account. The District’s amended <br />total loan amount will be $600,000($594,060for the total project costs and $5,940 for the 1% loan <br />origination fee). The terms shall be based on their prev ious interest rate of 2.5% per annum for 30-years. <br />Final approval of the loan shall be conditioned upon al l standard contracting provisions of the CWCB Loan <br />Program. Security for the loan shall be colla teral in compliance with CWCB Loan Policy #5. <br />Water Supply Protection • Watershed Protect ion & Flood Mitigation • Stream & Lake Protection • Water Supply Planning & Finance <br />Water Conservation & Drought Planning • In trastate Water Management & Development <br />