Laserfiche WebLink
<br />I <br /> <br />I. <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I. <br /> <br />I <br /> <br />EQIP COLORADO RIVER SALINITY RANKING CRITERIA VERSION 3.0 COST WORKSHEET <br /> <br />LANDOWNER: <br />AL TERNATIVE: <br /> <br />IAIt.# <br />Field# <br /> <br />Cherokee Village Project <br />Under round w/inlet str. <br /> <br /> Proposed Estimated <br />COMPONENT UNIT AMT. UNIT Cost Participant <br /> COST Share Cost <br /> - 0 0 $0.00 $0.00 <br />Pipe, Plastic, >-80 psi, 15-18" Ft 1200 14.25 $17,100.00 $5,343.75 <br />Pipe Plastic. 10-12" Ft 3000 8.25 $24,750.00 $7,734.38 <br />Cleaning Devices - Punch Plate Ibs 1000 1.90 $1,900.00 $593.75 <br />Reinforced Concrete Structure CY 13 600.00 $7,800.00 $2,437.50 <br />Measuring Devices - Flow Meter, >-6" Each 4 1860.00 $7,440.00 $2,325.00 <br />Screw Gate/Flap Gate Diln 15 48.75 $731.25 $228.52 <br />Pipe, Plastic, >-80 psi, <-8" Ft 600 7.30 $4,380.00 $1,368.75 <br />Earth moved CY 0 1.35 $0.00 $0.00 <br />Earth Moved CY 0 1.35 $0.00 $0.00 <br />Screw Gate/Flap Gate Diln 106 48.75 $5,167.50 $1,614.84 <br />Non-Reinforced Concrete Pipeline - Diameter: 18"-24" Ft 60 23.25 $1,395.00 $435.94 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> - 0 0 $0.00 $0.00 <br /> <br />