My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01841 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01841 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2011 12:52:40 PM
Creation date
8/11/2008 11:56:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150270
Contractor Name
Headgate 135 Lateral, Inc.
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />-.- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />I <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- -- <br />eGE 1 OF3 <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br /> <br />A structure will be installed so that the practice may be applied as a management component of a water management system to control the stage, discharge, distribution, delivery or <br />direction of water flow in accordance with standard and specification #587. NRCS aoproved desian & iob sheets and maintained for the effective life of the oroiect. <br /> <br />Fields: No Tract Fields: UN <br /> <br />Contract <br />Item <br />1 <br />1a <br /> <br />PLANNED CONSERVATION TREATMENT <br />Structure for Water Control (587) <br /> <br />Cleaning Devices. Punch Plate <br /> <br />1b <br /> <br />Reinforced Concrete Structure <br /> <br />1c <br /> <br />Measuring Devices - Flow Meter, >=6" <br /> <br />1d <br /> <br />Screw Gate/Fla Gate <br /> <br />Planned <br />Amount <br />1 no <br /> <br />Unit <br />Cost <br /> <br />Cost Shar <br />Rate! <br />Method <br />$17872 <br /> <br />1,OOO.0Ibs $1.90Ilbs 100% PR <br /> <br />13.0 C $600.00/C 100% PR <br />$1,860.00/E <br />4.0 Each ach 100% PR <br /> <br />15.00iln $48.75/Diln 100% PR <br /> <br />2008 <br />$ <br /> <br />1900 <br /> <br />7800 <br /> <br />7440 <br /> <br /> <br />Completion Schedule and Estimated Cost Share or Pa ent b Year <br />2009 2010 2011 2012 2013 2014 2015 2016 <br />$ $ $ $ $ $ $ $ <br /> <br />732 <br /> <br /> <br /> <br />2017 <br />$ <br /> <br />Buried, high pressure, thermoplastic pipeline 1/2" to 18" dia. installed in an irrigation system. Design and installation of pipeline will be in conformance with attached Colorado NRCS <br />Soecification No. 43000 and NRCS-aporoved enaineerina desians/iobsheets. <br /> <br />Fields: No Tract Fields: UN <br /> <br /> <br />Contract <br />Item <br />2 <br /> <br />PLANNED CONSERVATION TREATMENT <br />Irrigation Water Conveyance, Pipeline, <br />High-Pressure, Underground. Plastic <br />(43000) <br /> <br />2a <br /> <br />Pipe, Plastic, >=80 si,15-18" <br /> <br />Planned <br />Amount <br />1 ,200 ft <br /> <br />1,200.0 F <br /> <br />Unit <br />Cost <br /> <br />Cost Shar <br />Rate! <br />Method <br />$17100 <br /> <br />2008 <br />$ <br /> <br />$14.25/Ft 100% PR 17100 <br /> <br />Completion Schedule and Estimated Cost Share or Pa ent by Year <br />2009 2010 2011 2012 2013 2014 2015 2016 <br />$ $ $ $ $ $ $ $ <br /> <br />2017 <br />$ <br /> <br /> <br />Buried, high pressure, thermoplastic pipeline 1/2" to 18" dia. installed in an irrigation system. Design and installation of pipeline will be in conformance with attached Colorado NRCS <br />Soecification No. 43000 and NRCS-aooroved enaineerina desians/iobsheets. <br /> <br />Fields: No Tract Fields: UN <br /> <br />Contract <br />Item <br />3 <br /> <br />PLANNED CONSERVATION TREATMENT <br />Irrigation Water Conveyance, Pipeline. <br />High-Pressure, Underground, Plastic <br />43000 <br /> <br />Planned <br />Amount <br />1 ,250 ft <br /> <br />Unit <br />Cost <br /> <br />Cost Shar <br />Rate! <br />Method <br />$30780 <br /> <br />2008 <br />$ <br /> <br />Com letion Schedule and Estimated Cost Share or Payment b Year <br />2009 2010 2011 2012 2013 2014 2015 2016 <br />$ $ $ $ $ $ $ $ <br /> <br />2017 <br />$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.