My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150268 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150268 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:15:10 PM
Creation date
8/11/2008 11:55:18 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150268
Contractor Name
Louden Irrigating Canal and Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Using the value of the water at $4,500 per A-Ft <br /> <br />Benefit/Cost = $4,500/A-Ft x 491.4 A-Ft + $454,346 = 4.9 <br /> <br />Using a rental rate of water at $40 per A-Ft <br /> <br />Benefit/Cost = $40/A-Ft/year x 491.4 A-Ft x 30 years + $454,346 = 1.3 <br /> <br />COLLATERAL <br /> <br />The Louden Irrigation Canal and Reservoir Company can offer the following collateral for the <br />CWCB loan. <br /> <br />1. The revenue from assessments as allowed by the Company By-Laws <br />and Articles of Ineorporation. <br />2. A certificate of deposit account in the amount of one annual payment <br />to be held by the State Treasurer. <br />3. The physical assets of the project. <br /> <br />IMPLEMENTATION SCHEDULE <br /> <br />The following schedule is proposed for implementation of the project: <br /> <br />Task <br /> <br />Target Completion Date <br /> <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br /> <br />Feasibility Study <br />Design <br />SEO Design Review <br />Bid <br />Award Bid <br />Start Construction <br />Project Complete <br /> <br />6/1/08 <br />9/1/08 <br />1/1/09 <br />7/1/09 <br />8/15/09 <br />9/15/09 <br />12/31/09 <br /> <br />SOCIAL, ECONOMIC, AND PHYSICAL IMPACTS <br /> <br />The project will have no significant social impacts. <br /> <br />The project will have a positive economic impact by assisting the LICRC providing irrigation water <br />for approximately 2500 acres of shareholders' crops. <br /> <br />Rist-Benson Feasibility Study <br /> <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.