My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150268 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150268 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:15:09 PM
Creation date
8/11/2008 11:55:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150268
Contractor Name
Louden Irrigating Canal and Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Approval Letter
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Project Loan Program - Project Data <br /> <br />Borrower: Louden Irrigating Canal and Res. Co. County: Larimer <br /> <br />Project Name: Rist Benson Reservoir Project Type: Dam Rehabilitation <br />Dam Repair Project <br /> <br />Drainage Basin: South Platte River Basin Water Source: Big Thompson River <br /> <br />Total Project Cost: $290,000 Funding Sources: CWCB, Company <br /> <br />Type of Borrower: Blended Project Annual Recovery: 150 acre-feet <br />(Ag., Municipal, Commercial) <br /> <br />CWCB Loan: $263,610 (Including 1 % fee) <br /> <br />Interest Rate: 3.5% Term: 30 years <br /> <br />The Louden Irrigating Canal and Reservoir Company (Borrower) owns and operates the Rist Benson <br />Reservoir (Reservoir), which is on the west side of Loveland, Colorado. Since 2005, the Reservoir <br />has been restricted to a gauge height of 10.0 feet due to seepage problems along the dam. The <br />Borrower has repaired two sections of the embankment in previous years. This Project is the third <br />phase of repairs and once completed will increase storage by 150 AF allowing for full storage of 491 <br />AF. The rehabilitation involves excavating and re-compacting sections of the embankment, <br />installation of a toe drain, and installing riprap on the upstream face of the dam. Construction is <br />expected to begin in August of2009 with completion by the end of the year. <br /> <br /> <br />I <br />" <br />.' <br /> <br />," <br />, <br />, <br /> <br />, <br />., <br />., <br /> <br />Lake <br />Loveland <br /> <br />I <br />" <br />C <br />I <br />.,. <br />I <br />I <br /> <br /> <br />.~~\... . <br />.. <br />; <br /> <br />Boyd <br />Lake <br /> <br />"_..~J-:"',.--";"":,' <br /> <br />.I <br />, <br />, <br />T~W'7: <br />, <br />, <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.