Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />\ <br /> <br />CWCB has exempted a specific stream segment from <br />further "de minimusII depletions pursuant to Rule 9.33 <br />of the Rules and Regulations Concerning the Colorado <br />Instream Flow and Natural Lake Level Program, Applicant <br />shall not agree to augment under this plan any <br />additional uses to that instream flow segment that may <br />further increase the unreplaced depletions described in <br />paragraph 22a. above. <br /> <br />As provided above, this plan does not grant an exclusive right ~o <br />the Applicant to incur de minimis depletions to CWCB instream <br />flow rights-"_ Notwithstanding these provisions, should an <br />application be filed in Water Court for a structure or water use <br />that may cause such cumulative total to exceed one percent of the <br />decreed instantaneous flow rate for such an instream flow right, <br />Applicant shall not be required to remove from this augmentation <br />plan any structures or uses already accepted into this plan or to <br />reduce depletions from any structures or uses already accepted <br />into this plan. <br /> <br />23. Except as specifically described herein, or except as <br />separately decreed or administratively approved, replacement of <br />out-of-pri,ori ty depletions ,pursuant to th,is, _plan shall ocyur, at <br />the Rio Grande mainstem. Replacement of out-of-priority _ <br />depletions from structures which divert water tributary to the <br />Closed Basin and wells diverting w'ater from the confined aquifer , <br />shall occur directly to those sources. Such replacement shall <br />occur through faciliti-es approved by the Division Engineer--':or <br />such purposes. The Applicant shall have agreements in place with <br />the owners of such facilities before using such for this purpose. <br /> <br />24. The replacement requirement for uses to be augmented <br />under this plan shall be established using the criteria on the <br />attached Exhibit A, which shall be used until such time as the <br />State Engineer requires actual measurements or Applicant elects <br />to obtain and report actual measurements of water use. <br /> <br />25. The owners of all structures augmented under this plan <br />will be required to install and maintain measuring devices on <br />such structures, or to provide water use and depletion accounting <br />forms sufficient to meet reasonable accounting needs of the State <br />and Division Engineers. <br /> <br />26. The Division Engineer has statutory authority to <br />calculate and adjust transportation losses for releases of stored <br />water and to assess a transportation charge from time to time in <br />accordance with facts hereafter developed. Applicant shall <br />account for such charges in ?ccordance with the procedures <br />lawfully established by the Division Engineer. Applicant shall <br /> <br />Il~Ol j:\SLVW<.:D\rulinq-10 <br /> <br />A7 <br />