My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PAWSD_WCPlan_50%PR
CWCB
>
Water Efficiency Grants
>
Day Forward
>
PAWSD_WCPlan_50%PR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:32:32 AM
Creation date
8/7/2008 8:14:51 AM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-104
Applicant
Pagosa Area Water and Sanitation District
Project Name
Pagosa Area Water and Sanitation District Water Conservation Plan
Title
50% Progress Report
Date
7/29/2008
County
Archuleta
Water Efficiency - Doc Type
Interim Reports
Document Relationships
PAWSD_WCPlan2008
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 29, 2008 <br />Ms. Tammie Petrone <br />CWCB, Office of Water Conservation and Drought Planning <br />Grants Coordinator <br />1313 Sherman, Room 721 <br />Denver, CO 80203 <br />RE: Transmittal of 50% Complete Progress Report -Water Conservation Planning Grant <br />Dear Tammie, <br />Please consider this Pagosa Area Water and Sanitation District's 50% project report <br />prepared in accordance with the Water Conservation Planning Grant requirements. The <br />report provides information on the steps completed thus far, those issues encountered and <br />discussion on moving forward with completion of the plan. <br />Project Steps Completed <br />Since the issuance of Purchase Order # OE PDA 08000000104, signifying the award of <br />the grant from CWCB, PAWSD and its consultant Great Western Institute and other <br />subcontractors have been able to complete Tasks 1 through 5. Significant efforts are also <br />underway on Tasks 6 and 7. With the groundwork established regarding the success of <br />existing conservation measures as well as the necessary data on the District's existing <br />water customers, we now have the necessary information to forecast demands, review <br />future capital facilities needed and identify savings potential with the implementation of <br />additional conservation methods. <br />Project Highlights <br />The level of community participation in the planning process has certainly been a <br />highlight of the project thus far. Specific industries, County and Town representatives as <br />well as members of the community at large were invited to contribute and their <br />excitement and level of commitment has been very beneficial and will positively affect <br />the final plan. <br />Project Obstacles <br />The PAWSD staff and consultants experienced some difficulties with the historical data <br />accumulation and growth projections. The current economic slow-down nationally and <br />
The URL can be used to link to this page
Your browser does not support the video tag.