My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11759
CWCB
>
Floodplain Documents
>
DayForward
>
1100
>
FLOOD11759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:24:09 AM
Creation date
7/29/2008 10:54:55 AM
Metadata
Fields
Template:
Floodplain Documents
County
Mesa
Stream Name
Bosley Wash
Basin
Colorado Mainstem
Title
Bosley Wash Drainage Master Plan - Phase 2: Alternative Drainage Facility Evaluation - Draft
Date
11/1/2002
Prepared For
Bosley Wash Watershed, CWCB
Prepared By
HDR Engineering, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Boslf!.~ Vl!qsh Draina.se Mast~e.r ~lan.. <br />! ~-- ." ' <br /> <br />Phase 2: Altemative Drainage Facility Evaluation <br /> <br /> <br /> <br />Table 2 <br />Summary of 10- Year Capital Improvement Costs <br /> <br />Improvement Estimated Cost Reference Figure <br />Stub Ditch Channel Improvements $207,000 Figure 9 <br />F % Road Culvert Improvements $100,000 Figure 10 <br />Property Acquisition $487,000 N/A <br />Operation and Maintenance $0 N/A <br />Total: $795,000 <br /> <br />The structural improvements identified as p~~ of thi.s alternative are th~ most expensive <br />elements, but certainly do not represent the program in its entirety. Maintenance of these <br />new facilities, and all of the existing facilities, is critical. Particular attention should be <br />given to the underpasses and culverts that cross the existing network of irrigation ditches. <br />There has been historic evidence of erosion and sedimentation in the channels. This <br /> <br />should be monitored and, when necessary, corrected. Finally, there have been reports of <br />debris, such as tree limbs, large rocks or other types of obstructions, clogging the <br />facilities. The routine maintenance program helps to control this. Modifications to <br />entrances, including the construction of trash racks or debris basins, should be considered <br />and, when appropriate, included in the overall plan implementation process. <br /> <br />5.0 RECOMMENDED PLAN <br /> <br />5.1 Selected Improvements <br /> <br />The recommended plan, as conceived by HDR, consists of a combination of immediate <br />improvements and anticipation of future improvements. It attempts to reduce the flood <br />hazard during the frequent events immediately, while including components that are <br />consistent with a long term plan to control flood hazard from the lOO-year flood. It also <br />recognizes the cost of improvements and the burden that large capital expenditures place <br />on the County and the GJJD. The recommended plan includes recommendations to <br /> <br />[;3l~~~':~'~~~l;~:U\I '0.:~,:z?I;}'_:~2t:~T-.::7:,:-::''':':~i:=-_ '- ~~ ~~~-~=~'~::=~2~=- _ ~.. ~~:~.;::- _ <br /> <br />"',\~~"T&.~ <br />:> ,~,; <br />':i(':\if';:&~-;:;t,'~; <br /> <br /> <br />Page 21 <br /> <br />r;" <br />~ <br />'""\..:.:>' <br /> <br />@t <br />
The URL can be used to link to this page
Your browser does not support the video tag.