My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150255 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150255 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 9:16:57 AM
Creation date
7/28/2008 3:04:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150255
Contractor Name
Bijou Irrigation Company
Contract Type
Loan
Water District
1
County
Morgan
Weld
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4. cont. damage due to debris getting stuck on the structure <br />during high water times. Also center posts fail which requires <br />individuals and extra heavy equipment to replace the posts. <br />During these times of repairs we have to shut the Bijou Irrigation <br />canal out which interrupts irrigation or augmentation water <br />being utilized in the System. Repairs at times require individuals <br />to physically get in the River to accomplish repairs. One <br />major operational problem is the leaking of water through the <br />board system during low flows in the River. further details <br />are summarized in the feasibility study done by Nation Engineering <br />Service, LLC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.