Laserfiche WebLink
<br />4. cont. damage due to debris getting stuck on the structure <br />during high water times. Also center posts fail which requires <br />individuals and extra heavy equipment to replace the posts. <br />During these times of repairs we have to shut the Bijou Irrigation <br />canal out which interrupts irrigation or augmentation water <br />being utilized in the System. Repairs at times require individuals <br />to physically get in the River to accomplish repairs. One <br />major operational problem is the leaking of water through the <br />board system during low flows in the River. further details <br />are summarized in the feasibility study done by Nation Engineering <br />Service, LLC. <br />