Laserfiche WebLink
<br />the form attached as Appendix 5 and incorporated herein, shall be an undivided one <br />hundred percent (100%) interest in any rights the Borrower holds in the Project, <br />including approximately 7,000 feet of new pipeline and the associated access <br />easement rights, as more particularly described in the attached Deed of Trust <br />("Collateral"). <br /> <br />SECTION 7 - ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br /> <br />The CWCB approved the loan with the following conditions: <br /> <br />a. The BORROWER shall provide a copy to the CWCB of the executed USDA <br />Conservation Program Contract to verify that the USDA would provide <br />engineering services and a grant for the final construction cost. Copy of said <br />contract included with the above Feasibility Study referred to in Section 2 above. <br />b. Security for the loan includes (1) a pledge of assessment revenues backed by an <br />assessment covenant, (2) a debt service reserve fund equal to two annual loan <br />payments (one payment set aside at the time of contract execution and one third <br />of an annual payment set aside at the time the first three annual loan payments <br />are made), and (3) BORROWER'S Funding Agreement, which Funding Agreement <br />shall include a "step-up" provision that requires the Funding Agreement <br />signatories to make the entire annual loan payment to the CWCB in the event <br />any of the members fail to pay their assessed share amount pursuant to the <br />Funding Agreement. <br />c. Within ten (10) working days after receipt of the cost share portion <br />reimbursement from the USDA, the BORROWER shall submit to the CWCB an <br />amount equal to the reimbursement. The USDA reimbursement will be applied to <br />the outstanding principal loan balance, and the Loan Contract shall be amended <br />to the reduced loan amount. <br />SECTION 8 - CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br /> <br />B. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br /> <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />937-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br /> <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br /> <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCS staff. <br /> <br />Appendix 1 to Loan Contract C150234 <br />Page 2 of 4 <br />