<br />The main cost overruns associated with the project was damage caused by heavy rains; dewatering <br />efforts and the subsequent bypass ditch constructed to managed inflows into the reservoir, and <br />project location. These items cost the Company an additional $75,000 in muck excavation, <br />regrading efforts, remobilization, and $100,000 in bypass ditch construction. Therefore, the actual <br />cost to construct the project was approximately $385,000. The original cost estimate of $142,800, <br />significantly underestimated the time, effort, and cost to complete the project, given its location and <br />complexity. <br /> <br />Discussion <br /> <br />Due to additional work not programmed in the original cost estimate, weather conditions, project <br />location, and unforeseen variations in cost for specific items during construction, the overall cost of <br />the project has increased significantly. The Company is requesting an increase of $355,000 <br />($351,485 for project costs and $3,515 for a 1% origination fee), to its current loan authorization <br />$155,035, to cover 90% of the total cost ofthe project. <br /> <br />The total amended loan amount for the Company would be $510,035 (504,985 for project costs and <br />$5,050 for a 1% origination fee), at their original rate of 2.5 % for 30-years. The new annual <br />payment will be $26,805, which includes the 10% reserve requirement. The Company's current <br />loan of$155,035 has an annual payment of$8,148, which includes the 10% reserve requirement. <br /> <br />Financial Analysis <br /> <br />Table 2 shows a summary of the financial aspects of the project for the amended loan request. A <br />CWCB Loan of $510,035 would have an annual debt service obligation of $26,805 ($24,368 for <br />annual loan payment and $2,437 for the 10% reserve funding) for the loan terms of 2.5% for 30- <br />years. The total debt service obligation represents a cost of $16.54 per acre-foot for the reservoir <br />storage. <br /> <br />Table 2. Financial Summary of Project <br /> <br />Items Current Amended <br /> Reauest Request <br />Total Project Cost $171,845 $560,369 <br />CWCB Loan (90% of Total Project Cost + 1% Loan Fee) $155,035 $510,035 <br />CWCB Annual Loan Payment $7,407 $24,368 <br />CWCB Annual Loan Obligation (including 10% reserve) $8,148 $26,805 <br />Annual Assessment for Project Only (based on 1,600 shares) $5.09/share $ 16.75/share <br />Annual Project Cost! AF Adjudicated (based on 1,620AF) $5.02/ac-ft. $ 16.54/ac-ft. <br /> <br />Prior CWCB Loan History: <br />November 1992 CWCB loan contract for $42,000 for feasibility study (0% for 30 years) <br />October 1995 CWCB loan contract for $373,000 at 3% for 40 years ($343,000 project and $30,000 <br />existing FmHA loan) <br />May 2000 CWCB loan contract amendment consolidating both loans totaling $415,000 (2.733% for <br />40 years) <br />November 2007 current balance on this loan is $356,263. <br /> <br />3 <br />