My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150186 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150186 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 10:17:05 AM
Creation date
7/28/2008 3:03:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150186
Contractor Name
Lower Bauer West Lateral, Inc.
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />LOWER BAUER WEST LATERAL <br />DITCH REHABILITATION <br />; <br /> <br /> <br />,-;;'111: <br />Raymond Keith, Project Engineer, Looking South Along New Pipeline <br /> <br />Proiect Description <br /> <br />The Lower Bauer West Lateral owns and operates the west outlet lateral from Lower Bauer <br />Reservoir. This project involved the placement of 15,500 feet of 6-inch to 15-inch PYC pipe in or along <br />their existing open ditch system. The project was part of the Natural Resource Conservation Service's <br />(NRCS) Salinity Control Program, developed to reduce water loss, salt loads, and to produce working <br />pressure for downstream irrigation users. The total construction cost to complete the project was <br />$195,000. NRCS's grant contribution toward the project was approximately $112,000, for a final project <br />loan balance of$85,373. The project commenced construction in December of2005 and was completed in <br />July of2006. <br /> <br />Proiect Data <br /> <br />Sponsor: Lower Bauer West Lateral, Inc. County: Montezuma Water Source: Mancos River <br /> <br />Terms of Loan: $85,373.44@2.50% for 30-yrs. Substantial Completion Date: August 1,2006 <br /> <br />Design Engineer: NRCS - Cortez Office, CO. and Harward Irrigation Systems - Springville, UT <br /> <br />Construction Contractor: Lewis Excavating, Inc. - Mancos, Colorado <br /> <br />Design Elements: 15,500 feet of6-inch to 15-inch PYC Pipe <br /> <br />Average Annual Diversion: 44,400 acre-feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.