My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150180 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150180 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2013 8:09:33 AM
Creation date
7/28/2008 3:03:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150180
Contractor Name
Pinewood Springs Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />BORROWER: PINEWOOD SPRINGS WATER <br />DISTRICT <br />Contract No. C150180 <br />Original Loan Amount $2,054,188 <br />Adjustment (Increase): $757,501 <br />Adjusted Loan Amount $2,811,689 <br /> <br />Agency Name: Water Conservation Board <br />Agency Number PDA <br />Routing Number: 08 PDA iJ/1 //L/ <br />r <br /> <br />LOAN CONTRACT AMENDMENT No. 1 <br />(STANDARD CONTRACT- WAIVER#160-ApPROVED NOVEMBER 10, 2003) <br /> <br />This Amendment, made this May 15, 2008, by and between the State of Colorado <br />for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board ("CWCB"), and Pinewood Springs Water District, a Colorado special <br />district, 182 Cree Court, Lyons, Colorado 80540 ("BORROWER" or "CONTRACTOR"). <br /> <br />FACTUAL RECITALS <br /> <br />A. Authority exists in the law, and funds have been budgeted, appropriated, and otherwise <br />made available for payment in Contract Encumbrance Number C150180. <br />B. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br />C. The CWCB and the BORROWER entered into Contract Encumbrance Number C150180, <br />dated February 1, 2005 ("ORIGINAL CONTRACT"), incorporated herein by reference, <br />wherein the CWCB agreed to loan money in the total amount up to $2,054,189, and the <br />BORROWER agreed to repay the loan in accordance with the terms of the ORIGINAL <br />CONTRACT. <br />D. The BORROWER has requested an extension in the time the CWCB has allowed for <br />completion of the Project. <br />E. The CWCB has reviewed the BORROWER'S request and has agreed to amend this <br />contract to extend the time for completion until May 1, 2009. <br />F. Furthermore, during construction of the Project, the BORROWER encountered <br />unforeseen cost overruns due to design modifications from regulatory agencies. <br />These items increased the cost of the PROJECT by over $1,000,000. To meet the <br />increased costs, the BORROWER requested an additional $757,501 for a total loan <br />amount of $2,811 ,689. <br />G. At its March 2008 meeting, the CWCB approved increasing this loan by $757,501 for a <br />total loan amount of up to $2,811,689. The terms for the additional loan amount are <br />an interest rate of 4.00% per annum and a repayment period of 30 years. A loan <br />service fee of 1 % shall be imposed on the additional loan amount In accordance with <br />CWCB Policy No. 16. <br />H. The CWCB and the BORROWER have agreed to amend this contract to increase the <br />amount of the loan by $750,000 plus the 1 % loan service fee for a total loan amount of <br />up to $2,811,689. <br /> <br />Loan Contract C150180 Amendment No.1 <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.